Loading...
13-103225M City of Federal Way Community& Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 r Wuilding - Multi'Family Permit #: 13 -103225 -00 -MF Inspection Request Line: (253) 835-3050 Project Name: PARK AT DASH POINT APARTMENTS BUILDING Q Project Address: 31731 50TH LN SW Bldg Q Parcel Number: 112103 9129 Project Description: REP - Replace (2) decks on west side of building. Owner A lic n Contractor l=ender PARK AT DASH POINT c% CON G C S CONSTRUCTION INC G C S CONSTRUCTION INC OWNER IS LENDER AM MANAGEMENT 1432 JONES AVE NE GCSCOC1877CO (2/15/14) 1000 OAKESDALE AVE RENTON WA 98056 1432 JONES AVE NE RENTON WA 98055 RENTON WA 98056 Census Category: 434 - Residential altladd - no change in number of units Includes: # 1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load- Floor oadFloor Areas . ft. 0 0 0 0 Additional Permit Information Mechanical to be Included?...................................No Permit for Building Shell Only? .............................No Sensitive Areas? (Wetlands/Slopes, etc)................No Number of Stories.................................................3 Plumbing to be Included?......................................No Zoning Designation...............................................RM 2400 No Fixtures Associated With This Permit 11 PERMIT EXPIRES Saturday, February 15, 2014 Permit Issued on Monday, August 19, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. �i Owner or agent: `�J Date:_1s CITY of A& Federal Way PERMIT #: Project: • THIS CARD IS TOMAIN ON-SITE Construction In ection Record INSPECTION REQUE TS: (253) 835-3050 13 -103225 -00 -MF Address: 31731 50TH LN SW Bldg Q PARK AT DASH POINT C/O CON A FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Final - Building (4050) Approved Da — %45'c Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date SWM Precon Site Mtg (4400) Initial Erosion Control (4365) [:] Footings/Setback (4110) Approved To be done prior to breaking ground Approved to place concrete By Date By Date By Date Final - Building (4050) Approved Da — %45'c Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date Foundation Wall (4115) Drainage/Downspout (4040) [:] Re -steel (4215) Approved to place concrete Approved to backfill Approved to place concrete or grout By Date By Date By Date ❑ Slab/Concrete Floor (4255) Underfloor Framing (4285) Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date E] Shear Walls (4245) Roof Sheathing (4220) Fire/Draft Stops (4095) Approved to install siding Approved to install roofing Approved By Date By Date By Date Interim Erosion Control (4370) Framing (4120) Prior to scheduling a Framing inspection; Approved Electrical, Plumbing & Mechanical Rough -in and Approved to insulate By Date Fire/Draft Stop inspections must be signed -off and approved. IBC 1093.4 Dat. C Insulation (4150) Gypsum Wallboard Nailing (4130) Suspended Ceiling Grid (4265) Approved to install wallboard Approved to install mud & tape Approved to drop tile By Date By Date By Date Final - Fire Department (4060) Final - PlanningFinal Erosion Control (4375) Approved Approved Approved By Date By Date By Date Final - Building (4050) Approved Da — %45'c Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date ` REfIVED CITY OF Federal Way JUL 2 2 202 PERMIT APPLICATION CITY OF FEDERAL WAY CDS PERMIT NUMBER 0 30//'� TARGET DATE I 3 SITE ADDRESS SUITE/UNIT ! 3L l 56,- A -U &AD Fri wN w 14 PROJECT VALUATION ZONING Agsmsdws TA%/PARCEL i $ /1,43-2- `fob 1 % _L -d- I _0 _-_� - _'7 / , TYPE OF PERMIT BUILDING 11 PLUMBING El MECHANICAL El DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION rJfA.n\ NAME OF PROJECT !(g PROJECT DESCRIPTION Detailed description of work to be included on this permit only NAME PRIMARY PHONE PROPERTY OWNER 50 PAt le 1800 MAHJNG ADDItE33 A � STAT ZIP w N E C_ PHONE -C'2l -ISS" MAILING ADDRESS I'f32– SQ%G N E-MAIL 5 CONTRACTOR CITYaw% STATE FAR i/.v/�,� W � -AQ $ WA STATZ CQ R'S LICENSE CG 7 16 0Li�Si! F"IRATION DATE FERAL WAY BUSINESS LICENSE N NAME PRIMARY PHONE APPLICANT MAHmiNG ADD _ E -MAH, CITY STATE ZIP FAX PROJECT CONTACT NAME _D PRIMARY PHONE e (The individual to receive and MAILING ADDRESSe' a ,/, _ "' L respond to all correspondence .3 /" Cup STATE FAX / A V/lf,-• concerning this application) PROJECT FINANCING NAME OWNER -FINANCED Required value of$5,000 or more (RCW 19.27.095) MAILING ADDAP*, CITY, STATE, ZIP PHONE I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best Of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. 1 understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a part of this application. / — f r— Z02 SIGNATURE: DATE 7-1r-2-02 PRINT NAME: JY( Bulletin #100 –January 1, 2013 Page 1 of 3 kAHandouts\Permit Application • MECHANICAL PERMIT CRITICAL AREAS ON PROPERTY? Nn WATER PURVEYOR VALUE OF MECHANICAL WORK OF EXISTING IMPROVEMENTS Indicate how many o each type offtxture to be installed or relocated as part o this project. Do not ' de existingfixtures to remain AIR HANDLING UNITS FANS GAS PIPE OUTL OTHER (Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS C1 Y1 ta�N0 BOILERS FURNACES H ATER TANKS (Ga.) COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES PLUMBING VALUE OF PLUMBING WORK .PERMIT Indicate how many o each type o e to be installed or relocated as part o this project. Do not include existing res to remain. BATHTUBS (or Tub/shower combo) LAVS (Hand sinks) TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER (Describe) DRAINS SHOWERS VACUUM BREAKERS DRINKING F TAINS SINKS (Kitchen/utW WATER HEATERS (Ekork) HOS BS SUMPS WASHING MACHINES TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? Nn WATER PURVEYOR SEWER PURVEYORVALUE OF EXISTING IMPROVEMENTS EXISTING/PREVIOUS USE LOT SIZE (In Square Feet) EXISTING FIRE SPRINKLES EMT PROPOSED FIRE SUPPRESSION SYSTEM? C1 Y1 ta�N0 ❑ Yes Bulletin # 100 —January 1, 2013 Page 2 of 3 k:\Handouts\Pennit Application