13-103225M
City of Federal Way
Community& Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
r
Wuilding - Multi'Family
Permit #: 13 -103225 -00 -MF
Inspection Request Line: (253) 835-3050
Project Name: PARK AT DASH POINT APARTMENTS BUILDING Q
Project Address: 31731 50TH LN SW Bldg Q Parcel Number: 112103 9129
Project Description: REP - Replace (2) decks on west side of building.
Owner
A lic n
Contractor
l=ender
PARK AT DASH POINT c% CON
G C S CONSTRUCTION INC
G C S CONSTRUCTION INC
OWNER IS LENDER
AM MANAGEMENT
1432 JONES AVE NE
GCSCOC1877CO (2/15/14)
1000 OAKESDALE AVE
RENTON WA 98056
1432 JONES AVE NE
RENTON WA 98055
RENTON WA 98056
Census Category: 434 - Residential altladd - no change in number of units
Includes: # 1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load-
Floor
oadFloor Areas . ft. 0 0 0 0
Additional Permit Information
Mechanical to be Included?...................................No
Permit for Building Shell Only? .............................No
Sensitive Areas? (Wetlands/Slopes, etc)................No
Number of Stories.................................................3
Plumbing to be Included?......................................No
Zoning Designation...............................................RM 2400
No Fixtures Associated With This Permit 11
PERMIT EXPIRES Saturday, February 15, 2014
Permit Issued on Monday, August 19, 2013
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way. �i
Owner or agent: `�J Date:_1s
CITY of A&
Federal Way
PERMIT #:
Project:
• THIS CARD IS TOMAIN ON-SITE
Construction In ection Record
INSPECTION REQUE TS: (253) 835-3050
13 -103225 -00 -MF Address: 31731 50TH LN SW Bldg Q
PARK AT DASH POINT C/O CON A FEDERAL WAY, WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Final - Building (4050)
Approved
Da — %45'c
Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date
SWM Precon Site Mtg (4400)
Initial Erosion Control (4365)
[:]
Footings/Setback (4110)
Approved
To be done prior to breaking ground
Approved to place concrete
By
Date
By
Date
By
Date
Final - Building (4050)
Approved
Da — %45'c
Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date
Foundation Wall (4115)
Drainage/Downspout (4040)
[:]
Re -steel (4215)
Approved to place concrete
Approved to backfill
Approved to place concrete or grout
By
Date
By
Date
By
Date
❑
Slab/Concrete Floor (4255)
Underfloor Framing (4285)
Floor Sheathing (4105)
Approved to place concrete
Approved to sheath floor
Approved to install flooring
By
Date
By
Date
By
Date
E]
Shear Walls (4245)
Roof Sheathing (4220)
Fire/Draft Stops (4095)
Approved to install siding
Approved to install roofing
Approved
By
Date
By
Date
By
Date
Interim Erosion Control (4370)
Framing (4120)
Prior to scheduling a Framing inspection;
Approved
Electrical, Plumbing & Mechanical Rough -in and
Approved to insulate
By
Date
Fire/Draft Stop inspections must be signed -off and
approved. IBC 1093.4
Dat. C
Insulation (4150)
Gypsum Wallboard Nailing (4130)
Suspended Ceiling Grid (4265)
Approved to install wallboard
Approved to install mud & tape
Approved to drop tile
By
Date
By
Date
By
Date
Final - Fire Department (4060)
Final - PlanningFinal
Erosion Control (4375)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Final - Building (4050)
Approved
Da — %45'c
Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date
` REfIVED
CITY OF
Federal Way JUL 2 2 202
PERMIT APPLICATION
CITY OF FEDERAL WAY
CDS
PERMIT NUMBER 0 30//'�
TARGET DATE I 3
SITE ADDRESS
SUITE/UNIT !
3L l 56,- A -U &AD Fri wN w 14
PROJECT VALUATION
ZONING Agsmsdws TA%/PARCEL i
$ /1,43-2-
`fob 1 % _L -d- I _0 _-_� - _'7 / ,
TYPE OF PERMIT
BUILDING 11 PLUMBING El MECHANICAL El DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION
rJfA.n\
NAME OF PROJECT
!(g
PROJECT DESCRIPTION
Detailed description of work to
be included on this permit only
NAME
PRIMARY PHONE
PROPERTY OWNER
50
PAt le
1800 MAHJNG ADDItE33 A �
STAT
ZIP
w
N E
C_
PHONE
-C'2l -ISS"
MAILING ADDRESS
I'f32– SQ%G N
E-MAIL
5
CONTRACTOR
CITYaw%
STATE
FAR
i/.v/�,�
W � -AQ
$
WA STATZ CQ R'S LICENSE
CG 7 16 0Li�Si!
F"IRATION DATE
FERAL WAY BUSINESS LICENSE N
NAME
PRIMARY PHONE
APPLICANT
MAHmiNG ADD _
E -MAH,
CITY
STATE
ZIP
FAX
PROJECT CONTACT
NAME
_D
PRIMARY PHONE
e
(The individual to receive and
MAILING ADDRESSe' a ,/, _
"' L
respond to all correspondence
.3 /"
Cup STATE
FAX / A
V/lf,-•
concerning this application)
PROJECT FINANCING
NAME
OWNER -FINANCED
Required value of$5,000 or more
(RCW 19.27.095)
MAILING ADDAP*, CITY, STATE, ZIP
PHONE
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best
Of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. 1 understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in
the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied to the city as a part of this application.
/
— f r— Z02
SIGNATURE: DATE 7-1r-2-02
PRINT NAME: JY(
Bulletin #100 –January 1, 2013 Page 1 of 3 kAHandouts\Permit Application
•
MECHANICAL PERMIT
CRITICAL AREAS ON PROPERTY?
Nn
WATER PURVEYOR
VALUE OF MECHANICAL WORK
OF EXISTING IMPROVEMENTS
Indicate how many o each type offtxture
to be installed or relocated as
part o this project. Do not '
de existingfixtures to remain
AIR HANDLING UNITS
FANS
GAS PIPE OUTL
OTHER (Describe)
AIR CONDITIONER
FIREPLACE INSERTS
HOODS
C1 Y1 ta�N0
BOILERS
FURNACES
H ATER TANKS (Ga.)
COMPRESSORS
GAS LOG SETS
REFRIGERATION SYST
DUCTING
GAS PIPING
WOODSTOVES
PLUMBING
VALUE OF PLUMBING WORK
.PERMIT
Indicate how many o each type o
e to be installed or relocated as
part o this project. Do not include existing res to remain.
BATHTUBS (or Tub/shower combo)
LAVS (Hand sinks)
TOILETS
WATER PIPING
DISHWASHERS
RAINWATER SYSTEMS
URINALS
OTHER (Describe)
DRAINS
SHOWERS
VACUUM BREAKERS
DRINKING F TAINS
SINKS (Kitchen/utW
WATER HEATERS (Ekork)
HOS BS
SUMPS
WASHING MACHINES
TOTAL FIXTURES
GENERAL INFORMATION
CRITICAL AREAS ON PROPERTY?
Nn
WATER PURVEYOR
SEWER PURVEYORVALUE
OF EXISTING IMPROVEMENTS
EXISTING/PREVIOUS USE
LOT SIZE (In Square Feet)
EXISTING FIRE SPRINKLES EMT
PROPOSED FIRE SUPPRESSION SYSTEM?
C1 Y1 ta�N0
❑ Yes
Bulletin # 100 —January 1, 2013 Page 2 of 3 k:\Handouts\Pennit Application