13-1038844 -
Ouilding - Si>hge Family
CityFederal Way Permit #: 13-103884-00-S F
Community
& Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: 253 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609 p Q
Project Name: GILBERT
Project Address: 32820 50TH PL SW Parcel Number: 802952 0280
Project Description: REP - Remove cedar shakes, install plywood and composition shingle roofing system.
Owner
lican
Contractor
Lender
RICHARD GILBERT
HORIZON CONTRACTORS INC
HORIZON CONTRACTORS INC
LORETTA GILBERT
PO BOX 24449
HORIZCI110KR (5/19/15)
32820 50TH PL SW
FEDERAL WAY WA 98093
PO BOX 24449
-
FEDERAL WAY WA 98003
FEDERAL WAY WA 98093
Census Category: 555 - Non-structural roofing permits
Includes: #1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load
Floor Areas . ft0 1 0 1 0 L 0
Additional Permit Information
New / Additional Sq. Feet - 3rd Floor....................0
Mechanical to be Included?...................................No
New / Additional Sq. Feet - Basement...................0
Plumbing to be Included?......................................No
No Fixtures Associated With This Permit 11
PERMIT EXPIRES Sunday, March 2, 2014
Permit Issued on Tuesday, September 3, 2013
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the C' of Federal Way.
Owner or agent: Date: -71AIV
CITY OF vl:&!�
Federal Way
PERMIT #:
Project:
THIS CARD IS TOMAIN ON-SITE
Construction In ection Record
INSPECTION REQUE TS: (253) 835-3050
13 -103884 -00 -SF Address: 32820 50TH PL SW
RICHARD GILBERT FEDERAL WAY, WA 98023-3325
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑ Final Erosion Control (4375) Final - Building (4050)
Approved Approved
By Date Datg -_ I
SWM Precon Site Mtg (4400)
Initial Erosion Control (4365)
E]
Underfloor Framing (4285)
n
Approved
By
To be done prior to breaking ground
Approved to install siding
Approved to sheath floor
By
Date
By
Date
By
Date
❑ Final Erosion Control (4375) Final - Building (4050)
Approved Approved
By Date Datg -_ I
Floor Sheathing (4105)
Shear Walls (4245)
Roof Sheathing (4220)
n
Approved to install flooring
By
Date
Approved to install siding
Approved to install roofing
By
Date
By
By
Date
By Ik& 15 Date 9 Ils- 1
Prior to scheduling a Framing inspection;
Fire/Draft Stops (4095)
Interim Erosion Control (4370)
Approved
Approved
Electrical, Plumbing & Mechanical Rough -in and
By
Date
By
Date
Fire/Draft Stop inspections must be signed -off and
approved. IBC 109.3.4
Framing (4120)
Insulation (4150)
Gypsum Wallboard Nailing (4130)
Approved to insulate
Approved to install wallboard
Approved to install mud & tape
By
Date
By
Date
By Date
❑ Final Erosion Control (4375) Final - Building (4050)
Approved Approved
By Date Datg -_ I
Rough Electrical
Approved
Final Electrical
Approved
n
Right of Way
Approved
By
Date
By
Date
By
Date
q S 13
UK8
No �ti+ ovI si-{,c +�w« o -F ins -�i
s weGO ( i S q Vt7VlA T
�h
Is
EiVED
CITY or POC
PERM I14kPPLICA'TION
Federal Way SEP p 3 2013
p'O
CMOF W y
PZ=rr NUMBER3-4-1
E/-/— tTARGET DATE
SITE ADDRESS PI SW
�ZgZo sG�
SUITE/UNIT #
PROJECT VALUATION
ZONING
ASSESSOR'S TAX/PARCEL #
$ (aOC
_
TYPE OF PERMIT
] ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION
NAME OF PROJECT
1B`UILDIINNG
6,;
PROJECT DESCRIPTION
Detailed description of work to
�GG 4 I� I I WG LG Gf TIG S Ill
be included on this perndt only
PROPERTY OWNER
NAME LG�G li ► I �"
PRIMARY PHONE
MAILING ADDRESS
E-MAIL
CITY
STATE
ZIP
'
NAS
PHONE
MAD.DI6 ADDREss Pak
1!' 0;'X �
E-MAIL
CONTRACTOR
CITY
Ft rl� I✓G,WA
�%w%3
FAX
WA STATE CONTRACTOR'S LICENSE #
Har: C; 110 k)z
ON DATE
4/ j 1-1
FEDERAL WAY BUSINESS LICENSE #
NAME
PRIMARY PHONE
MAILING ADDRESS
EMAIL
APPLICANT
CITY
STATE
ZIP
FAX
PROJECT CONTACT
NAME �l 64VC
PR PHONE
MALI ING ADDRESS
EMAIL
(The individual to receive and
respond to all correspondence
CITY
STATE
ZIP
PAX
concerning this application)
PROJECT FINANCING
NAME
❑ OWNER -FINANCED
Required value of $5,000 or more
(RCW 19.27.095)
MAILING ADDRESS, CITY, STATE, ZIP
PHONE
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best
of my knowledge, the ir;jbrmation submitted in support of this permit application is true and correct. I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorised by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in
the investigation and defense of such claim!), which may be made by any person, including the undersigned, and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied to the city as a of this application.
SIGNATURE: DATE ?A
PRINT NAME:
Bulletin #100 – January 1, 2013 Pagel of 3 k:\Handouts\Permit Application