12-101771I
City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: MASSEY
0 FILE
Project Address: 4230 SW 314TH ST
Mechanical
Permit #: 12 -101771 -00 -ME
Inspection Request Line: (253) 835-3050
Project Description: GAS TO GAS WATER HEATER REPLACEMENT
Parcel Number: 873199 0260
Owner
Applican
Contractor
JOEL D MASSEY
WESCO NORTHWEST PERMIT
WASHINGTON ENERGY SERVICES CO
BONNIE L MASSEY
NORTHWEST PERMIT/ WESCO
(GENERAL)
4230 SW 314TH ST
1345 W GULF RD
WASMES9710B (9/2/13)
FEDERAL WAY WA
POINT ROBERTS WA 98281
2800 THORNDYKE AVE W
98023
SEATTLE WA 98199
Additional Permit Information
Mechanical Valuation............................................950.00 Is this an Online or O.T.C. application? ................. Yes
Mechanical Fixtures
Hot Water Tanks ............................ 1
PERMIT EXPIRES Saturday, October 20, 2012
Permit Issued on Monday, April 23, 2012
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: ■ �� Date:
■■ 11 L
r.--(NWX> 51clit
cm or VA��
Federal Way
PERMIT #:
Project:
THIS CARD IS TOMAIN ON-SITE
Construction I ection Record
INSPECTION REQU TS: (253) 835-3050
12 -101771 -00 -ME Address: 4230 SW 314TH ST
JOEL D MASSEY FEDERAL WAY, WA 98023-2163
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑
Mechanical Rough -in (4165)
Gas Piping (4125)
Final Electrical
Approved
Final - Mechanical (4065)
Approved
By
Approved to release test
Approved
By
Date
By
Date
By
jq�'— Datepd
❑
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date