Loading...
13-100546I City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 112h: (253) 835-2607 Fax: (253) 835-2609 Project Name: KEMBEL 0 FILE Project Address: 4749 SW 314TH PL i Mechanical Permit #: 13 -100546 -00 -ME Inspection Request Line: (253) 835-3050 -,'04 0 Parcel Number: 211572 0530 Project Description: Replace existing gas furnace, relocate gas piping and seal ductwork Owner nlicant Contractor STEVEN F KEM 3EL DWAYNE CURTISS ALL WAYS AIR CONTROL INC JANA KEMBEL ALL WAYS AIR CONTROL INC ALLWAAC074C3 (5/6/14) 4749 SW 314TH PL 1515 S CENTER ST 1515 S CENTER ST FEDERAL WAY WA TACOMA WA 98409 TACOMA WA 98409 98023 Additional Permit Information Is this an Online or O.T.C. application?.................Yes Mechanical Fixtures Furnaces ......................................... 1 PERMIT EXPIRES Sunday, August 4, 2013 Permit Issued on Tuesday, February 5, 2013 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ^ w 1 N M 1 ra Date: 4 C-li%lt's .THIS CARD IS TO#ection MAIN ON-SITE ` MY OF Construction In Record Federal Way INSPECTION REQTS: (253) 835-3050 PERMIT #: 13 -100546 -00 -ME Address: 4749 SW 314TH PL Project: STEVEN F KEMBEL FEDERAL WAY, WA 98023-3701 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. FILE Mechanical Rough -in (4165) Gas Piping (4125) Final Electrical Approved Final - Mechanical (4065) Approved By Approved to release test Approved By Date By Date By Date FILE Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date