13-1009490 Mechanteal
Permit #: 13 -100949 -00 -ME
Project Name: SOLOMON
Project Address: 2146 SW 316TH ST
Project Description: REMOVE AND REPLACE GAS WATER HEATER
Inspection Request Line: (253) 835-3050
$b NGj
Parcel Number: 122103 9075
Owner
Annlicant
City of Federal Way
Community &Econ. Dev. Services
FILE
33325 8th Ave S
FAST WATER HEATER CO (GENERAL)
Federal Way, WA 98003
FAST WATER HEATER COMPANY
Ph: (253) 835-2607 Fax: (253) 835-2609
2146 SW 316TH ST
0 Mechanteal
Permit #: 13 -100949 -00 -ME
Project Name: SOLOMON
Project Address: 2146 SW 316TH ST
Project Description: REMOVE AND REPLACE GAS WATER HEATER
Inspection Request Line: (253) 835-3050
$b NGj
Parcel Number: 122103 9075
Owner
Annlicant
Contractor
RICHARD SOLOMON
JESSICA VARON
FAST WATER HEATER CO (GENERAL)
GAIL SOLOMON
FAST WATER HEATER COMPANY
FASTWWH948BC (1/4/14)
2146 SW 316TH ST
12601 132ND AVE NE
12601 132ND AVE NE
FEDERAL WAY WA 98023-2212
KIRKLAND WA 98034
KIRKLAND WA 98034
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes
Mechanical Fixtures
Hot Water Tanks ............................ 1
PERMIT EXPIRES Wednesday, August 28, 2013
Permit Issued on Friday, March 1, 2013
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent:0% 11 JIM III a IN E Date:
f I WAUSZ> 3A 1 /13
crry & VAi�
Federal Way
THIS CARD IS TO MAIN ON-SITE
Construction In ection Record
INSPECTION REQ TS: (253) 835-3050
PERMIT #: 13 -100949 -00 -ME Address: 2146 SW 316TH ST
Project: RICHARD SOLOMON FEDERAL WAY, WA 98023-2212
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Mechanical Rough -in (4165)Gas
Piping (4125)
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By Date
By Date
By Date
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date