14-106243City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Electrical
Permit #: 14 -106243 -00 -EL
FILE Inspection Request Line: 253 835-3050
P q
Project Name: LMP ACQUISITION H LLC �,rj1?T
Project Address: 2266 SW 313TH ST Parcel Number: 178990 0020
Project Description: Service and Panel Replacement. Install new 200 Amp Service to home and connect ersiting
circuits.
Owner
Arnlicant
Contractor
LMP ACQUISITION II LLC
TIMOTHY REALE
TRI POWER ELECTRIC LLC
2266 SW 313TH PL
TRI POWER ELECTRIC LLC
TRIPOPE8621`7 (10/27/16)
FEDERAL WAY WA 98023
2230 ADAMS AVE S
2230 ADAMS AVE
EVERET17 WA 98203
EVERETT WA 98203-5342
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes Is Use Educational or Institutional? ....................... No
Electrical Fixtures
Alt. Serv./Feeder. 0 to 200 amps (F 1
PERMIT EXPIRES Saturday, June 6, 2015
Permit Issued on Monday, December 8, 2014
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: Date:
CITY OF VAI�
Federal Way
' THIS'CARD IS TO MAIN ON-SITE
Construction In ection Record
INSPECTION REQ TS: (253) 835-3050
PERMIT #: 14 -106243 -00 -EL Address: 2266 SW 313TH ST
Project: LMP ACQUISITION II LLC FEDERAL WAY, WA 98023-7825
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Final - Electrical (4055)
Approved
By - Date
LIFER Ground (4295)Ditch
By C
cover (4030)
Temporary Power (4275)
Slab/Concrete Floor (4255)
Approved
Approved
By
Approved
By
Approved to place concrete
By
Date
By
Date
By
Date
0 Final - Electrical (4055)
Approved
By - Date
Pool Bonding (4195)
By C
Date
Temporary Power (4275)
Approved
Ceiling Cover (4020)
Approved
By
Approved
By
Date
Date
By
Date
Date
Feeders/Sub-panels (4045)
Rough Electrical (4225)
Approved
Approved
By
Date
By
Date
0 Final - Electrical (4055)
Approved
By - Date
Service (4235)
Approved
By C
Date
Final Electrical
Approved
Ceiling Cover (4020)
Approved
By
Date
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date