19-100723r
Mechanical
City y Federal Way Permit #:19 -100723 -00 -ME
Community Development Dep[.
338th Ave S FILE
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-260260 7 Fax: (253) 8352609
Project Name: DINKINS
Project Address: 124 S 297TH PL Parcel Number: 776420 0020
Project Description: Replace existing gas furnace
Owner
Applicant
Contractor
CRAIG DINKINS
JAIMIE HOWBRENNAN HEATING & A/C
BRENNAN HEATING & A/C LLC
124 S 297TH PL
4601 S 134TH PL
(GENERAL 01)
FEDERAL WAY WA 98003-3629
SEATTLE WA 98168
BRENNHA971R9 (12/29/19)
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Mechanical Work Valuation? .................................. 3199 Is this an Online or O.T.C. application?.................. Yes
01
i
-,
v
y ��I� F1�turE�f
Furnaces 1
PERMIT EXPIRES Tuesday, 13 August, 2019
Permit Issued on Thursday, February 14, 2019
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy an he use will be in accordance with the laws, rules and regulations of the State of
[\&i1gNIF City of Federal Way.
Owner or agent:
Date:
My of
Federal Way
THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 19100723 00 Address: 124 S 297TH PL
Project: KARI K DINKINS FEDERAL WAY WA 98003-3629
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑ Rough Electrical Final ElectricalRight of Way
Approved Approved Approved
By Date By Date
By Date
Mechanical Rough -in (4165)
®
Gas Piping (4125)Q
Final - Mechanical (4065)
Approved
IBY
Approved to release test
]BY
Approved
By
Date
Date
Date "L..,t21.--ii
❑ Rough Electrical Final ElectricalRight of Way
Approved Approved Approved
By Date By Date
By Date