Loading...
12-101717• I 1 0 Electrical City of Federal Way Community &Econ. Dev. Services' Permit #: 12 -101717 -00 -EL 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: 253 835-3050 LE Ph: (253) 835-2607 Fax: (253) 835-2609 p q Project Name: SAM'S MARKET Project Address: 803 SW 312TH ST UNIT 101 Parcel Number: 072104 9125 Project Description: Lighting Upgrade Owner ARRlican Contractor GLADYS MEDINA HOON LEE ENERGY MANAGEMENT SERVICES 424 S 60TH ENERGY MANAGEMENT SERVICES (ELECTRICAL) TACOMA WA 98408 15008 35TH AVE W ENERGMS913136 (1/26/13) LYNNWOOD WA 98087 15008 35TH AVE W SUITE C LYNNWOOD WA 98087 Additional Permit Information Is Use Educational or Institutional?.......................No Service greater than 999 Amps? ............................. No Electrical Fixtures Circuits - Commercial .................... 5 PERMIT EXPIRES Friday, April 18, 2014 Permit Issued on Wednesday, April 18, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: I I KI c Date: FIRni rD 5/1 (*/12. CITY OF 4 A i� Federal Way PERMIT #: Project: THIS CARD IS TO MAIN ON-SITE Construction In ection Record INSPECTION REQ TS: (253) 835-3050 12 -101717 -00 -EL Address: 803 SW 312TH ST UNIT 101 GLADYS MEDINA FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 11 Final - Electrical (4055) Approved ±ZL"' Date LIFER Ground (4295)13 Ditch cover (4030) Temporary Power (4275)Service Slab/Concrete Floor (4255) Approved By Approved Approved to place concrete By Date By Date By Date 11 Final - Electrical (4055) Approved ±ZL"' Date Pool Bonding (4195) Temporary Power (4275)Service (4235) By Approved By Approved By Approved By Date By Date By Date Ceiling Cover (4020) Feeders/Sub-panels (4045) 0 Rough Electrical (4225) Approved Approved Approved By Date By Date By Date 11 Final - Electrical (4055) Approved ±ZL"' Date Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date