Loading...
12-105589t it City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax. (253) 835-2609 Project Name: ROPER Project Address: 525 SW 312TH ST Mikhanical Permit #: 12 -105589 -00 -ME OWE 0 Inspection Request Line: (253) 835-3050 Parcel Number: 555920 0025 Project Description: Replace existing gas furnace and heat pump with new gas furnace and heat pump. Like for like in size Owner Aanlicant Contractor ROBERT S ROPER DAVE TREAT AUBURN SHEET METAL INC (GENERAL) 525 SW 312TH ST AUBURN SHEET METAL INC AUBURI*222RQ (4/30/13) FEDERAL WAY WA 98023-4819 844 S MT. VILLA DR PO BOX 1354 ENUMCLAW WA 98022 ENUMCLAW WA 98022 Additional Permit Information Mechanical Valuation............................................10000 Is this an Online or O.T.C. application? ................. Yes Mechanical Fixtures Compressors / Heat Pumps............ 1 Furnaces ......................................... 1 PERMIT EXPIRES Wednesday, June 12, 2013 Permit Issued on Friday, December 14, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington d t i o eral Way. Owner or agent: (IN Date: CITY OF A& Federal Way THIS CARD IS TO MAIN ON-SITE Construction In ection Record INSPECTION REQ TS: (253) 835-3050 PERMIT #: 12 -105589 -00 -ME Address: 525 SW 312TH ST Project: ROBERT S ROPER FEDERAL WAY, WA 98023-4819 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165) Gas Piping (4125) Final Electrical Approved Final - Mechanical (4065) 1:1Approved Approved By Approved to release test Approved By Date By Date y Date p Rough Electrical Approved M Final Electrical Approved 1:1Approved Right of Way By Date By Date By Date