Loading...
13-101477City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax (253) 835-2609 Project Name: TAC BUILD LLC Project Address: 134 SW 312TH PL iuilding - Single Family Permit #: 13 -101477=00 -SF P Inspection Request Line: (253) 835-3050 Parcel Number: 555780 0220 Project Description: ALT - Remodel single family residence for resale including replacement of aluminum windows, removal of non-bearing wall in kitchen, repair some sheathing for re -roof. ***5/21/13 Add plumbing & mechanical**** Owner ARRlicant Contractor Lender MICHAEL HOPKINS L & E RESTORATIONS LLC L & E RESTORATIONS LLC OWNER IS LENDER TAC BUILD LLC 415 173 ST S LERESER870CF (2/6/15) 2123 S "I" ST SPANAWAY WA 98387 415 173 ST S TACOMA WA 98405 SPANAWAY WA 98387 Census Category: 434 - Residential alt/add - no change in number of units Includes. #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load- Floor oadFloor Areas . ft. 0 0 1 0 1 0 Additional Permit Information New / Additional Sq. Feet -1 st Floor .................... 0 New / Additional Sq. Feet - 3rd Floor....................0 New / Additional Sq. Feet - Deck ......................... 0 Mechanical to be Included? .................................... es Plumbing to be Included?.......................................Yes New / Additional Sq. Feet - 2nd Floor...................0 New / Additional Sq. Feet - Basement ..................0 New / Additional Sq. Feet - Garage.......................0 New / Additional Sq. Feet - Other ..........................0 New / Additional Sq. Feet - Total .......................... Mechanical Fixtures' Fans................................................ 3 Plumbing Fixtures :7::: ............................... Lavatories....................................... 2 Water Closets................................. 2 Subject to field inspection without plans. f*, I r. PE EXPIRES Sunday, September 29, 2013 Permit Issued on Tuesday, April 2, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington _I and the City of Feder M. Owner or agent: Date: — �r CITY OF Federal Way PERMIT #: Project: THIS CARD IS TO ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 13-101477-00SF Address: 134 SW 312TH PL MICHAEL HOPKINS FEDERAL WAY, WA 98023-4639 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card 0 SWM Precon Site Mtg (440)Initial Rough Plumbing (4230) Erosion Control (4365) echanical Rough -in (4165) Plumbing Groundwork (4190) Approved By To be done prior to breaking ground By Date Approved to cover By Date By Date By Date Roof Sheathing (4220) Underfloor Framing (4285) Rough Plumbing (4230) Floor Sheathing (4105) echanical Rough -in (4165) Shear Walls (4245) Approved to sheath floor By Approved to install flooring By Date Approved to install siding By Date By Date By Date Roof Sheathing (4220) Final - Plumbing (4075) Rough Plumbing (4230) Final - Building (4050) echanical Rough -in (4165) Approved to install roofing Approved By Approved By Date By Date B Date��4//113>, Gas Piping (4125) Fire/Draft Stops (4095) 0 Interim Erosion Control (4370) Approved to release test Approved Approved By Date By Date By Date Insulation (4150) Framing (4120) scheduling a Framing inspection; lumbing &Mechanical Rough -in andApproved P: E to insulate proved to install wallboard top inspections must be signed -off and IBC 1093.4 Date aB By Date05L Gypsum Wallboard Nailing (4130) 0 Final Erosion Control (4375) Final - Mechanical (4065) Approved to install mud & tape Approved Approved Date By Date By Date ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date Final - Plumbing (4075) Final - Building (4050) Approved Approved By Date By Date ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date City of Federal Way Community & Econ. Dev. services 33325 8th Ave S F I 9 wilding - Single Fhmily Permit #: 13-101477-00-$F ellerway, wA soo3 Inspection Request Line: (253) 835-3050 Ph: (253) 835-- 2607 Fax: (253) 835-2609 : •: Project Name: TAC BUn D LLC Project Address: 134 SW 312TH PL Parcel Number: 555780 0220 Project Description: ALT - Remodel single family residence for resale including replacement of aluminum windows, removal of non-bearing wall in kitchen, repair some sheathing for re -roof. No plumbing or mechanical. Owner MICHAEL HOPKINS ARRlicant L & E RESTORATIONS LLC Contractor L & E RESTORATIONS LLC Lender OWNER IS LENDER TAC BUILD LLC 415 173 ST S LERESER870CF (2/6/15) 2123 S "I" ST SPANAWAY WA 98387 415 173 ST S TACOMA WA 98405 SPANAWAY WA 98387 Census Category: 541- Residential to nonresidential conversion Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load- Floor oadFloor Area . ft. 0 1 0 0 1 0 Additional Permit Information New / Additional Sq. Feet - 3rd Floor....................0 Mechanical to be Included?...................................No New / Additional Sq. Feet - Basement...................0 Plumbing to be Included?......................................No No Fixtures Associated With This Permit 11 CONDITIONS: Subject to field inspection without plans. 1. All new windows replaced shall comply with IRC 310.1 for egress at bedrooms 2. The minimum net clear opening height shall be 24 inches 3. The minimum net clear opening width shall be 20 inches sill height(opening) of not more than 44 inches above the floor. 4. All emergency escape and rescue openings shall have a minimum net clear opening of 5.7 square feet (0.530 m2). Exception: Grade floor openings shall have a minimum net clear opening of 5 square feet (0.465 m2).1. PERMIT EXPIRES Sunday, September 29, 2013 Permit Issued on Tuesday, April 2, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington nd t Federal Wa . } Date: Owner or agent • !'HIS CARD IS TO MAIN ON-SITE CWY CWConstruction In ection Record Federal Way INSPECTION REQ TS: (253) 835-3050 PERMIT #: 13 -101477 -00 -SF Address: 134 SW 312TH PL Project: MICHAEL HOPKINS FEDERAL WAY, WA 98023-4639 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El SWM Precon Site Mtg (440)Initial Erosion Control (4365) Walls (4245) Underfloor Framing (4285) 0 Roof Sheathing (4220) Approved Approved to install flooring To be done prior to breaking ground Approved to sheath floor By Date By Date By Date El Floor Sheathing (4105)Shear Walls (4245) 0 Roof Sheathing (4220) Right of Way Approved to install flooring Date Approved to install siding Approved to install roofing By Date Date By Date By Date 0 Fire/Draft Stops (4095) Interim Erosion Control (4370) ior to Framing inspection; Approved Approved scheduling a ical, Plumbing & Mechanical Rough -in and By Date +5 By Date [Fire/DraftStop inspections must be signed -off and approved. IBC 109.3.4 ❑ Gypsum Wallboard Nailing (4130) Framing (4120) Insulation (4150) Approved to insulate Approved to install wallboard Approved to install mud & tape By Date By Date By Date 0 Final Erosion Control (4375) Final - Building (4050) Approved Approved By Date Date (e _-�L37_f ,3 El Rough Electrical Approved Final Electrical Approved 1:1Approved Right of Way By Date By Date By Date Ir crff."'�S' • Federal Way PERMITPPLICATION REC VED p 'Y10 APR 0 S 2013 PERMIT NUMBER 3-_� D __q1 Z_ S F CM cwmmmamo GIS 7 F cns SITE ADDRESS * SUITE/UNIT t ;- Re & 6- E& VALUATION ZONING ASSESSOR'S TAR/PARCEL • $U�v `s .ss 2Gy_�� TYPE OF PERMIT DING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT -race u l PROJECT DESCRIPTION vrzrz— /ices Detailed description of work to be included on this permit only PROPERTY OWNER NAME �- PRIMARY PHONE '�7(- MAILING ADDRESS EMAIL C sT zIP NAME ' BGG P MAILING ADDRESS CONTRACTOR CI 747- ZIPJ Q e FAX C✓Z� C:�%r�'I, C% �� ("'[; WA STATE CONTRACTOR'S LICENSE N EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE 0 �G.% , & e f NAME PRIMARY PHONE 5 APPLICANT MAILlNG ADDRESS E-MAIL C 11IE ZIP '"3k 77 3k FA8 PROJECT CONTACTS NAME t PRIMARY PHONE ING ADDRESS EMAIL (The individual to receive and respond to all correspondence CITY STATE ZIP FAX concerning this application) PROJECT FINANCING NAME �'OWNER-FINANCED Required value of $5,000 or more MAILING ADDRESS, CITY, STATE, ZIP PHONE (RCW ] 9.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as apart of this application. SIGNATURE: DATE PRINT NAME: Bulletin #100 – January 1, 2013 Page 1 of 3 k:\Handouts\Permit Application