13-101477City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax (253) 835-2609
Project Name: TAC BUILD LLC
Project Address: 134 SW 312TH PL
iuilding - Single Family
Permit #: 13 -101477=00 -SF
P
Inspection Request Line: (253) 835-3050
Parcel Number: 555780 0220
Project Description: ALT - Remodel single family residence for resale including replacement of aluminum
windows, removal of non-bearing wall in kitchen, repair some sheathing for re -roof.
***5/21/13 Add plumbing & mechanical****
Owner
ARRlicant
Contractor
Lender
MICHAEL HOPKINS
L & E RESTORATIONS LLC
L & E RESTORATIONS LLC
OWNER IS LENDER
TAC BUILD LLC
415 173 ST S
LERESER870CF (2/6/15)
2123 S "I" ST
SPANAWAY WA 98387
415 173 ST S
TACOMA WA 98405
SPANAWAY WA 98387
Census Category: 434 - Residential alt/add - no change in number of units
Includes. #1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load-
Floor
oadFloor Areas . ft. 0 0 1 0 1 0
Additional Permit Information
New / Additional Sq. Feet -1 st Floor .................... 0
New / Additional Sq. Feet - 3rd Floor....................0
New / Additional Sq. Feet - Deck ......................... 0
Mechanical to be Included? .................................... es
Plumbing to be Included?.......................................Yes
New / Additional Sq. Feet - 2nd Floor...................0
New / Additional Sq. Feet - Basement ..................0
New / Additional Sq. Feet - Garage.......................0
New / Additional Sq. Feet - Other ..........................0
New / Additional Sq. Feet - Total ..........................
Mechanical Fixtures'
Fans................................................ 3
Plumbing Fixtures
:7::: ............................... Lavatories....................................... 2 Water Closets................................. 2
Subject to field inspection without plans. f*, I r.
PE EXPIRES Sunday, September 29, 2013
Permit Issued on Tuesday, April 2, 2013
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
_I and the City of Feder
M.
Owner or agent: Date:
— �r
CITY OF
Federal Way
PERMIT #:
Project:
THIS CARD IS TO ON-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
13-101477-00SF Address: 134 SW 312TH PL
MICHAEL HOPKINS FEDERAL WAY, WA 98023-4639
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card
0
SWM Precon Site Mtg (440)Initial
Rough Plumbing (4230)
Erosion Control (4365)
echanical Rough -in (4165)
Plumbing Groundwork (4190)
Approved
By
To be done prior to breaking ground
By Date
Approved to cover
By
Date
By
Date
By
Date
Roof Sheathing (4220)
Underfloor Framing (4285)
Rough Plumbing (4230)
Floor Sheathing (4105)
echanical Rough -in (4165)
Shear Walls (4245)
Approved to sheath floor
By
Approved to install flooring
By Date
Approved to install siding
By
Date
By
Date
By
Date
Roof Sheathing (4220)
Final - Plumbing (4075)
Rough Plumbing (4230)
Final - Building (4050)
echanical Rough -in (4165)
Approved to install roofing
Approved
By
Approved
By Date
By
Date
B
Date��4//113>,
Gas Piping (4125)
Fire/Draft Stops (4095)
0
Interim Erosion Control (4370)
Approved to release test
Approved
Approved
By Date
By
Date
By
Date
Insulation (4150)
Framing (4120)
scheduling a Framing inspection;
lumbing &Mechanical Rough -in andApproved
P:
E
to insulate
proved to install wallboard
top inspections must be signed -off and
IBC 1093.4
Date
aB
By
Date05L
Gypsum Wallboard Nailing (4130)
0
Final Erosion Control (4375)
Final - Mechanical (4065)
Approved to install mud & tape
Approved
Approved
Date
By
Date
By
Date
❑ Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date
Final - Plumbing (4075)
Final - Building (4050)
Approved
Approved
By
Date
By
Date
❑ Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date
City of Federal Way
Community & Econ. Dev. services
33325 8th Ave S
F I 9
wilding - Single Fhmily
Permit #: 13-101477-00-$F
ellerway, wA soo3 Inspection Request Line: (253) 835-3050
Ph: (253) 835-- 2607 Fax: (253) 835-2609 : •:
Project Name: TAC BUn D LLC
Project Address: 134 SW 312TH PL
Parcel Number: 555780 0220
Project Description: ALT - Remodel single family residence for resale including replacement of aluminum
windows, removal of non-bearing wall in kitchen, repair some sheathing for re -roof. No
plumbing or mechanical.
Owner
MICHAEL HOPKINS
ARRlicant
L & E RESTORATIONS LLC
Contractor
L & E RESTORATIONS LLC
Lender
OWNER IS LENDER
TAC BUILD LLC
415 173 ST S
LERESER870CF (2/6/15)
2123 S "I" ST
SPANAWAY WA 98387
415 173 ST S
TACOMA WA 98405
SPANAWAY WA 98387
Census Category: 541- Residential to nonresidential conversion
Includes: #1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load-
Floor
oadFloor Area . ft. 0 1 0 0 1 0
Additional Permit Information
New / Additional Sq. Feet - 3rd Floor....................0
Mechanical to be Included?...................................No
New / Additional Sq. Feet - Basement...................0
Plumbing to be Included?......................................No
No Fixtures Associated With This Permit 11
CONDITIONS:
Subject to field inspection without plans.
1. All new windows replaced shall comply with IRC 310.1 for egress at bedrooms
2. The minimum net clear opening height shall be 24 inches
3. The minimum net clear opening width shall be 20 inches sill height(opening) of not more than 44 inches
above the floor.
4. All emergency escape and rescue openings shall have a minimum net clear opening of 5.7 square feet (0.530
m2).
Exception: Grade floor openings shall have a minimum net clear opening of 5 square feet (0.465 m2).1.
PERMIT EXPIRES Sunday, September 29, 2013
Permit Issued on Tuesday, April 2, 2013
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
nd t Federal Wa . }
Date:
Owner or agent
• !'HIS CARD IS TO MAIN ON-SITE
CWY CWConstruction In ection Record
Federal Way INSPECTION REQ TS: (253) 835-3050
PERMIT #: 13 -101477 -00 -SF Address: 134 SW 312TH PL
Project: MICHAEL HOPKINS FEDERAL WAY, WA 98023-4639
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El
SWM Precon Site Mtg (440)Initial
Erosion Control (4365)
Walls (4245)
Underfloor Framing (4285)
0 Roof Sheathing (4220)
Approved
Approved to install flooring
To be done prior to breaking ground
Approved to sheath floor
By
Date
By
Date
By
Date
El
Floor Sheathing (4105)Shear
Walls (4245)
0 Roof Sheathing (4220)
Right of Way
Approved to install flooring
Date
Approved to install siding
Approved to install roofing
By
Date
Date
By
Date
By Date
0
Fire/Draft Stops (4095)
Interim Erosion Control (4370)
ior to Framing inspection;
Approved
Approved
scheduling a
ical, Plumbing & Mechanical Rough -in and
By
Date
+5
By
Date
[Fire/DraftStop inspections must be signed -off and
approved. IBC 109.3.4
❑ Gypsum Wallboard Nailing (4130)
Framing (4120)
Insulation (4150)
Approved to insulate
Approved to install wallboard
Approved to install mud & tape
By
Date
By
Date
By Date
0
Final Erosion Control (4375)
Final - Building (4050)
Approved
Approved
By
Date
Date (e _-�L37_f ,3
El
Rough Electrical
Approved
Final Electrical
Approved
1:1Approved
Right of Way
By
Date
By
Date
By
Date
Ir crff."'�S'
•
Federal Way
PERMITPPLICATION
REC VED p
'Y10
APR 0 S 2013
PERMIT NUMBER 3-_� D __q1 Z_ S F CM cwmmmamo GIS 7 F
cns
SITE ADDRESS
*
SUITE/UNIT t
;- Re & 6-
E& VALUATION
ZONING
ASSESSOR'S TAR/PARCEL •
$U�v
`s .ss 2Gy_��
TYPE OF PERMIT
DING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION
NAME OF PROJECT
-race u l
PROJECT DESCRIPTION
vrzrz—
/ices
Detailed description of work to
be included on this permit only
PROPERTY OWNER
NAME �-
PRIMARY PHONE
'�7(-
MAILING ADDRESS
EMAIL
C
sT
zIP
NAME
' BGG
P
MAILING ADDRESS
CONTRACTOR
CI
747-
ZIPJ Q e
FAX C✓Z� C:�%r�'I, C% �� ("'[;
WA STATE CONTRACTOR'S LICENSE N
EXPIRATION DATE
FEDERAL WAY BUSINESS LICENSE 0
�G.% , &
e f
NAME
PRIMARY PHONE
5
APPLICANT
MAILlNG ADDRESS
E-MAIL
C
11IE
ZIP '"3k 77
3k
FA8
PROJECT CONTACTS
NAME
t
PRIMARY PHONE
ING ADDRESS
EMAIL
(The individual to receive and
respond to all correspondence
CITY
STATE
ZIP
FAX
concerning this application)
PROJECT FINANCING
NAME
�'OWNER-FINANCED
Required value of $5,000 or more
MAILING ADDRESS, CITY, STATE, ZIP
PHONE
(RCW ] 9.27.095)
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best
of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in
the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied to the city as apart of this application.
SIGNATURE: DATE
PRINT NAME:
Bulletin #100 – January 1, 2013
Page 1 of 3
k:\Handouts\Permit Application