Loading...
12-100961s • Is City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 0 FILL Mechanical Permit #: 12 -100961 -00 -MSE Inspection Request Line: (253) 835-3050 Project Name: GAMBLE a°I bg Project Address: 4015 SW 317TH ST Parcel Number: 8731981700 Project Description: GAS TO GAS WATER HEATER REPLACEMENT Owner A_ lican Contractor TROY M & WENDY GAMBLE WESCO NORTHWEST PERMIT WASHINGTON ENERGY SERVICES CO 4015 S 317TH ST NORTHWEST PERMIT/ WESCO (GENERAL) FEDERAL WAY WA 98023 1345 W GULF RD WASHIES97IOB (9/2/13) POINT ROBERTS WA 98281 2800 THORNDYKE AVE W SEATTLE WA 98199 Additional Permit information Mechanical Valuation............................................950.00 Is this an Online or O.T.C. application? ................. Yes Hot Water Tanks ............................ 1 Mechanical Fixtures PERMIT EXPIRES Wednesday, August 29, 2012 Permit Issued on Friday, March 2, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington C' d t Ity eral Way. Owner or agent: Date: 3 ZZi 2, ,,, NMI1111111101M W� CITY OF Federal Way PERMIT #: Project: TffiS CARD IS TO MAIN ON-SITE Construction In ection Record INSPECTION REQ TS: (253) 835-3050 12 -100968 -00 -ME Address: 2831 SW 340TH PL THERON N WOOD FEDERAL WAY, WA 98023-7734 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough -in (4165) 0 Gas Piping (4125)Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By () Date (i� Rough Electrical Approved Final Electrical Approved ❑Right of Way Approved By Date By Date By Date