Loading...
19-100999Project Name: NAEHER/YONG Project Address: 2819 SW 340TH PL Project Description: like for like furnace replacement Mechanical Permit #:19 -100999 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 010920 0250 Owner Applicant City of Federal Way JAMES C NAEHER Community Development Dept. 33325 8th Ave S BOB'S HEATING & A/C INC (GENERAL) Federal Way, WA 98003 FILE Ph: (253) 835-2607 Fax: (253) 835-2609 FEDERAL WAY WA Project Name: NAEHER/YONG Project Address: 2819 SW 340TH PL Project Description: like for like furnace replacement Mechanical Permit #:19 -100999 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 010920 0250 Owner Applicant Contractor JAMES C NAEHER LUCINDA HONEYCUTTBOB'S HEATING BOB'S HEATING & A/C INC (GENERAL) 2819 SW 340TH PL & A/C INC BOBSHHA853NQ (9/7/19) FEDERAL WAY WA 14148 NE 190TH ST 14148 NE 190TH ST 98023 KIRKLAND WA 98072 WOODINVILLE WA 98072 Additional Permit Information Mechanical Work Valuation? .................................. 3500 Is this an Online or O.T.C. application?.................. Yes Furnaces 1 PERMIT EXPIRES Saturday, 31 August, 2019 Permit Issued on Monday, March 4, 2019 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ONI _INF Date: �:,Y'�a`4 . THIS CARD IS TO REMAIN ON-SITE CM of VA�Fetlera! Way Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 19100999 00 Address: 2819 SW 340TH PL Project: YONG SUN FEDERAL WAY WA 98023-7734 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 1❑ Mechanical Rough -in (4165) 0 Gas Piping (4125) Q Final - Mechanical (4065) Right of Way Approved Approved Approved to release test IBY60Date Approved By Date By By Date By 3L1,9 By Date El Rough Electrical Final Electrical Right of Way Approved Approved I Approved By Date By Date By Date