Loading...
11-101432so City of Federal Way T Plumbing Community Development Services Permit #: 11 -101432 -00 -PL P.O. Box 9718 Federal Way, WA 98063-9718 Inspection Request Line: Ph: (253) 835-2607 Fax: (253) 835-2609 p Q (253) 835-3050 Project Name: CHANG / LEE a.., 19 Project Address: 1730 SW 318TH PL Unit 39B Parcel Number: 8561101510 Project Description: Remove/replace existing water heater Ownr. Applicant Contractor DANNY CHANG GREG ANDRADA A A A HEATING & AIR CONDITIONING INC CAROLINA LEE A A A HEATING & AIR CONDITIONING INC AAAHTR197ILW (6/19/11) 1730 SW 318TH PL UNIT 37B 22641 83RD AVE SW 22653 83RD AVE NW FEDERAL WAY WA 98023 KENT WA 98032 KENT WA 98032 Water Heaters ................................. 1 PERMIT EXPIRES Tuesday, October 11, 2011 Permit Issued on Thursday, April 14, 2011 1 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State -of Washington and the City of Federal Way. f Owner or agent: Date: NINAUSPIl &/00/11 CITY OF VAI� Federal Way PERMIT #: TMS WARD IS TO REMAIN ON-SITE is Construction I1ection Record INSPECTION REQUE TS: (253) 835-3050 11 -101432 -00 -PL Address: 1730 SW 318TH PL Unit 39B Project: DANNY CHANG FEDERAL WAY, WA 98023-5157 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Final - Plumbing (4075) Approved By Date Plumbing Groundwork (4190) Rough Plumbing (4230) Final Electrical Approved Gas Piping (4125) 1:1Approved Approved to cover By Approved Approved to release test By Date By Date By Date Final - Plumbing (4075) Approved By Date Rough Electrical Approved Final Electrical Approved 1:1Approved Right of Way By Date By Date By Date