Loading...
19-100710I s,, City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Mechanical Permit #:19 -100710 -00 -ME FILEInspection Request Line: (253) 835-3050 Project Name: FRENK Project Address: 31014 39TH PL SW Project Description: Replace existing electric air handler and heat pump Parcel Number: 758200 0040 Owner Applicant Contractor JOEL FRENK JAIMIE HOWBRENNAN HEATING & A/C BRENNAN HEATING & A/C LLC 31014 39TH PL SW 4601 S 134TH PL (GENERAL 01) FEDERAL WAY WA SEATTLE WA 98168 BRENNHA971R9 (12/29/19) 98023-2179 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Mechanical Work Valuation? .................................. 9600 Is this an Online or O.T.C. application?.................. Yes Air Handling Units 1 Compressors / Heat Pumps 1 PERMIT EXPIRES Monday, 12 August, 2019 Permit Issued on Wednesday, February 13, 2019 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: nK11 Date: • THIS CARD IS TO REMAIN ON-SITE �. C" or 46� Construction Inspection Record Federal Vft INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 1910071000 Address: 31014 39TH PL SW Project: JOEL WILLIAM FRENK FEDERAL WAY WA 98023-2179 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El Mechanical Rough -in (4165) 0 Gas Piping (4125)3❑ Final Electrical Final - Mechanical (4065) Approved Approved to release test Approved Approved By Date By Date Approved By Date a..2 Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date IBy Date