Loading...
12-104640c t '0 City of Federal Way FILE Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MCKINNA Project Address: 411 SW 321ST ST Project Description: Gas to gas hotwater heater install Mechanical . Permit #: 12 -104640 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 9264901170 Owne ARRlican Contractor MICHAEL MCKINNA WESCO NORTHWEST PERMIT WASHINGTON ENERGY SERVICES CO 411 SW 321ST ST NORTHWEST PERMIT/ WESCO (GENERAL) FEDERAL WAY WA 98023-5628 1345 W GULF RD WASHIES97IOB (9/2/13) POINT ROBERTS WA 98281 2800 THORNDYKE AVE W SEATTLE WA 98199 Additional Permit Information Mechanical Valuation............................................950 Hot Water Tanks ........................... Is this an Online or O.T.C. application? ................. es Mechanical Fixtures' PERMIT EXPIRES Monday, April 8, 2013 Permit Issued on Wednesday, October 10, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington ONUNF= i o eraI Way. Owner or agent Date: Fns 4o/x/(a* CITY OF Federal Way PERMIT #: THIS CARD IS TO MAIN ON-SITE Construction In ection Record INSPECTION REQ TS: (253) 835-3050 12 -104640 -00 -ME Address: 411 SW 321 ST ST Project: MICHAEL MCKINNA FEDERAL WAY, WA 98023-5628 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough-in(4165)11 Gas Piping (4125) Final - Mechanical (4065) 0 Approved Approved to release test Approved By Date By Date By Date �ZZ Rough Electrical Approved 1:1Approved Final Electrical 1:1Approved Right of Way By Date By Date By Date