Loading...
19-100407City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax (253) 835-2609 FILE Electrical Permit #:19 -100407 -00 -EL Inspection Request Line: (253) 835-3050 Project Name: PAWAR Project Address: 33411 38TH AVE S Parcel Number: 618143 0010 Project Description: ELECTRICAL WORK FOR GAS FURNACE REPLACEMENT - STANDARD RECONNECT Owner Applicant Contractor GURPREET PAWAR RACHAEL AILSHIEPACIFIC HEATING & PACIFIC AIR SYSTEMS (ELECTRICAL 33411 38TH AVE S COOLING 02) FEDERAL WAY WA 98003 8607 DURANGO ST SW PACIFAS853LB (6/2/19) LAKEWOOD WA 98499 12811 PACIFIC HWY S LAKEWOOD WA 98023 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Low Voltage - Other (Resident 1 PERMIT EXPIRES Friday, 24 January, 2020 Permit Issued on Thursday, January 24, 2019 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Wingt nd of Federal Way. s Owner or agent: Date: d MY er V& Federal Way PERMIT #: Project: THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 19100407 00 Address: 3341138Th AVE S GURPREET K PAWAR FEDERAL WAY WA 98001-9571 10 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are insure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 UFER Ground (4295) ® Ditch cover (4030) F11 Slab/Concrete Floor (4255) Service (4235) Approved Approved Date Approved to place concrete By Date By Date By Date ® Pool Bonding (4195) ® Temporary Power (4275)© �jA Date Y-'-1 4By Service (4235) Approved Date Approved Approved By Date By Date By Date 0 Feeders/Sub-panels (4045) Rough Electrical (4225) � Ceiling Cover (4020) By Approved Date �jA Date Y-'-1 4By Approved Right of Way Date 0 Final- Electrical (4055) Approved By Date 3`'l Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date DATE INSPECTOR .. «, 67 llrnp��f