18-104345City of Federal Wry
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax (253)835-2609
. - I. t A
Electrical
Permit #:18 -104345 -00 -EL
FILE
Inspection Request Line:, (253) 835-3050
Project Name: GLEN PARK APARTMENTS BLDG 11
Project Address: 952 SW CAMPUS DR
Project Description: Bldg 11-8 units change main breakers for each one
Parcel Number: 192104 9005
Owner
Applicant
Contractor
PRIME WOODLEY CAMPUS DRIVE LLC
MARK JENSENINNOVATIVE SYSTEMS
INNOVATIVE SYSTEMS TECHNOLOGY
PO BOX 360859
TECH, INC.
INC (EL 01)
LOS ANGELES CA 90036
1402 LAKE TAPPS PKWY SE SUITE 104-147
INNOVST881134 (1/24/20)
USA
AUBURN WA 98092
.402 LAKE TAPPS PKWY SE SUITE 104-14'
AUBURN WA 98092
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Alt. ServJFeeder: 0 to 200 aml 8
PERMIT EXPIRES Friday, 20 September, 2019
Permit Issued on Thursday, September 20, 2018
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date:
, I+
ury or V&
Federal Way
PERMIT #: 1810434500
THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
Address: 952 SW CAMPUS DR Bldg 11
Project: PRIME WOODLEY CAMPUS DRIVI FEDERAL WAY WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0
Service (4235)
Q
Feeders/Sub-panels (4045)
®
Rough Electrical (4225)
Approved
Approved
Approved
By
Date
By
Date
By
Date
® Final - Electrical (4055)
Approved
By bate
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date