Loading...
18-104345City of Federal Wry Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax (253)835-2609 . - I. t A Electrical Permit #:18 -104345 -00 -EL FILE Inspection Request Line:, (253) 835-3050 Project Name: GLEN PARK APARTMENTS BLDG 11 Project Address: 952 SW CAMPUS DR Project Description: Bldg 11-8 units change main breakers for each one Parcel Number: 192104 9005 Owner Applicant Contractor PRIME WOODLEY CAMPUS DRIVE LLC MARK JENSENINNOVATIVE SYSTEMS INNOVATIVE SYSTEMS TECHNOLOGY PO BOX 360859 TECH, INC. INC (EL 01) LOS ANGELES CA 90036 1402 LAKE TAPPS PKWY SE SUITE 104-147 INNOVST881134 (1/24/20) USA AUBURN WA 98092 .402 LAKE TAPPS PKWY SE SUITE 104-14' AUBURN WA 98092 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Alt. ServJFeeder: 0 to 200 aml 8 PERMIT EXPIRES Friday, 20 September, 2019 Permit Issued on Thursday, September 20, 2018 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: , I+ ury or V& Federal Way PERMIT #: 1810434500 THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 Address: 952 SW CAMPUS DR Bldg 11 Project: PRIME WOODLEY CAMPUS DRIVI FEDERAL WAY WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Service (4235) Q Feeders/Sub-panels (4045) ® Rough Electrical (4225) Approved Approved Approved By Date By Date By Date ® Final - Electrical (4055) Approved By bate Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date