Loading...
13-103100Project Name: SPOHN Project Address: 2527 SW 323RD ST Project Description: ELEC FOR A/C 0 Electrical Permit #: 13 -103100 -00 -EL Inspection Request Line: (253) 8354050 Parcel Number: 8731801020 Owne JASON SPOHN ARplicant NORTHWEST PERMIT/ WESCO City of Federal Way 2527 SW 323RD ST Community & Econ. Dev. Services FILE 33325 8th Ave S POINT ROBERTS WA 98281 Federal Way, WA 98003 Ph: (253) 835-2607 Fax (253) 835-2609 2800 THORNDYKE AVE W Project Name: SPOHN Project Address: 2527 SW 323RD ST Project Description: ELEC FOR A/C 0 Electrical Permit #: 13 -103100 -00 -EL Inspection Request Line: (253) 8354050 Parcel Number: 8731801020 Owne JASON SPOHN ARplicant NORTHWEST PERMIT/ WESCO Contractor WASHINGTON ENERGY SERVICES CO 2527 SW 323RD ST 1345 W GULF RD (ELECTRICAL) FEDERAL WAY WA 98023-2520 POINT ROBERTS WA 98281 WASHIES971OD (9/4/13) 2800 THORNDYKE AVE W SEATTLE WA 98199 Additional Permit Infonnation Is this an Online or O.T.C. application?.................Yes Electrical F"odures Circuits - Residential ...................... Is Use Educational or Institutional? ....................... No PERMIT EXPIRES Sunday, July 12, 2015 Permit Issued on Friday, July 12, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and i eral Way. Owner or agent: nbIL.Date: 1W am r Federal Way PERMIT #: Project: THIS CARD IS TOMAIN ON-SITE r • Construction In ection Record INSPECTION REQUE TS: (253) 835-3050 13 -103100 -00 -EL Address: 2527 SW 323RD ST JASON SPOHN FEDERAL WAY, WA 98023-2520 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. UFER Ground (4295)Ditch cover (4030) Temporary Power (4275)11 lab/Concrete Floor (4255) 1:1Approved Approved By Approved Approved to place concrete By Date By Date By Date Pool Bonding (4195) Temporary Power (4275)11 1:1Approved Service (4235) By Approved By Approved By Approved By Date By Date By Date 0 Feeders/Sub-panels (4045) Rough Electrical (4225) Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date ❑ Final - Electrical (4055) Approved Date (— Rough Electrical Approved Final Electrical Approved 1:1Approved Right of Way By Date By Date By Date