Loading...
14-105184I . 0 -. City of Federal Way PETE D CHAILANTE Community & Econ. Dev. Services 33325 8th Ave S BRENNAN HEATING & A/C LLC Federal Way, WA 98003 W FILE Ph: (253) 835-2807 Fax: (253) 835-2809 4231 SW 323RD ST It r Electrical Permit #: 14 -105184 -00 -EL Inspection Request Line: (253) 835-3050 Project Name: CHAILANTE Project Address: 4231 SW 323RD ST Parcel Number: 873202 0720 Project Description: 1 circuit for heat pump (outdoor unit only) Owner ApRiacant Contractor PETE D CHAILANTE JAIMIE HOW BRENNAN HEATING & A/C LLC GLORIA J CHAILANTE BRENNAN HEATING & A/C (ELECTRICAL) 4231 SW 323RD ST 4601 S 134TH PL BRENNHA962DU (3/31/16) FEDERAL WAY WA 98023 SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional'Pelrmit Information Is this an Online or O.T.C. application?.................Yes Electrical Fbitures Circuits - Residential ...................... 1 Is Use Educational or Institutional?.......................No CONDITIONS: A permanently installed heat pump is not allowed to be placed within required yards (setbacks). PERMIT EXPIRES Sunday, April 5, 2015 Permit Issued on Tuesday, October 7, 2014 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: WNLIrVE CITY OF 40:& Federal Way PERMIT #: THIS CARD IS TO )MAIN ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 14 -105184 -00 -EL Address: 4231 SW 323RD ST . Project: PETE D CHAILANTE FEDERAL WAY, WA 98023-2495 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ Final - Electrical (4055) Approved By Date I o F] UFER Ground (4295) Ditch cover (40 30) Temporary Power (4275) Slab/Concrete Floor (4255) ❑ Approved ❑ Approved Approved to place concrete By Date By Date By Date ❑ Final - Electrical (4055) Approved By Date I o F] Rough Electrical Approved❑ ❑ Temporary Power (4275) ❑ Service (4235) ❑ Pool Bonding (4195) Approved Date Approved Date Approved By Date By Date By Date ❑ Ceiling Cover (4020) ❑ Rough Electrical (4225) ❑ Feeders/Sub-panels (4045) Approved Approved Approved By Date By Date By Date ❑ Final - Electrical (4055) Approved By Date I o F] Rough Electrical Approved❑ Final Electrical Approved ❑ Right of Way Approved By Date By Date By Date