Loading...
15-105969Mechanical City of Community & Econ. Fedeoev s rvices ' ' ' lJ'ermit #: 15-105969-OQ�M 33325 8th Ave S Federal Way, WA 96003 Inspection Request Line: 253 835-3050 Ph: (253) 835-2807 Fax: (253) 835-2609 p q Project Name: SONG mom" Project Address: 3755 SW 3197M ST FILL Parcel Number: 873198 3140 Project Description: Replace existing gas furnace. Owner YONGSUN SONG Rlicant SARAH TURNER Contractor GLENDALE HEATING & A/C (GENERAL) CHAECHON SONG GLENDALE HEATING & A/C GLENDHA053Q2 (11/2/17) 3755 SW 319TH ST 12462 DES MOINES WAY S 12462 DES MOINES MEMORIAL DR FEDERAL WAY WA 98023 SEATTLE WA 98168-2266 SEATTLE WA 98168-2266 Additional Permit Information Mechanical Work Valuation?.................................5200.00 Is this an Online or O.T.C. application? ................. Yes Mechanical Fixtures Furnaces ......................................... 1 PERMIT EXPIRES Sunday, May 22, 2016 Permit Issued on Tuesday, November 24, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington eral Way. 9Owner ora ent: ONLINE Date: 4-..1- �-, CITY OF 1A Federal Way PERMIT #: 15 -105969 -00 -ME THIS CARD IS TO REMAIN ON-SITE Construction Intction Record • INSPECTION REQU TS: (253) 835-3050 Address: 3755 SW 319TH ST Project: YONGSUN SONG FEDERAL WAY, WA 98023-2154 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD Inspections are listed as close to sequential order as possible4ead left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165)E]Gas Piping (4125) E] Final - Mechanical (4065) 1:1Approved Approved Right of Way --^ Approved to release test Approved By Date By Date By Date � a p2 Rough Electrical Approved 1:1Approved Final Electrical 1:1Approved Right of Way --^ By Date By Date By Date