Loading...
16-104595Project Name: CITY MID Project Address: 31675 PACIFIC HWY S Project Description: Install 4 Low Voltage TStats & 4 - Temp Sensors Eldlctrkal Permit #: 16 -104595 -00 -EL Inspection Request Line: (253) 835-3050 Parcel Number: 082104 9077 Owner ARRlican City of Federal Way HARSCH INVESTMENT PROPERTIES Community 8 Econ. ev. Services D K SYSTEMS INC 33325 8th Ave S FILE Federal Way, WA 98003 PORTLAND OR Ph: (253) 835-2807 Fax: (253) 835-2809 PO BOX 886 Project Name: CITY MID Project Address: 31675 PACIFIC HWY S Project Description: Install 4 Low Voltage TStats & 4 - Temp Sensors Eldlctrkal Permit #: 16 -104595 -00 -EL Inspection Request Line: (253) 835-3050 Parcel Number: 082104 9077 Owner ARRlican Contractor HARSCH INVESTMENT PROPERTIES TAMI MICHELSEN D K SYSTEMS INC PO BOX 2708 D K SYSTEMS INC DKSYSI" 987M6 (8/5/18) PORTLAND OR 962 S SPRUCE ST PO BOX 886 97208 BURLINGTON WA 98233 BURLINGTON WA 98233 Additional Permit Information Electrical Work Valuation?...................................A000.00 Is this an Online or O.T.C. application?................ Yes Is Use Educational or Institutional? ....................... No Service greater than 999 Amps? ............................. No Electrical Fixtures Low Voltage - Other (Commercial 1 Thermostat ............................... PERMIT EXPIRES Friday, Permit Issued on Thursday, I hereby certify that the above information is correct and that the occupancy and the use will be in accordance with the Ig Owner or agent: C� �r 15, 2017 1 2016 ion o e above described property and r of the State of Washington Date: Tffi§ CARD IS TO REMAIN ON-SITE • l-, aff owr Feral VYby Construction Inspection Record INSPECTION REQ TS: (253) 835-3W PERMT #: 16 -104595 -00 -EL Address: 31675 PACIFIC HWY S Project: HARSCH INVESTMENT PROPERTI FEDERAL WAY, WA 98003-5407 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CAM. . Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 1:1Right a oncrete Floor (425 0 Roughectn ( Final Electrical Approved in - Electrical E Approved to place concrete 71 Approved Date I Approved By Date B=z--rr Date to _ it 1I BY Date 1:1Right Rough Electrical Approved1:1 Final Electrical Approved E of Way Approved By Date By Date By Date