19-100905 Mechanical
City of Federal Way Permit #:19-100905-00-ME
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 FILE
Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax(253)835-2609
Project Name: BARRERA CRUZ/CHAVEZ
Project Address: 32510 10TH PL S Parcel Number: 326070 0830
Project Description: Install 2-ton a/c
•
Owner Applicant Contractor
FRANCISCO BARRERA CRUZ JAIMIE HOWBRENNAN HEATING&A/C BRENNAN HEATING&A/C LLC
32510 10TH PL S 4601 S 134TH PL (GENERAL 01)
FEDERAL WAY WA 98003 SEATTLE WA 98168 BRENNHA971R9(12/29/19)
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Mechanical Work Valuation? 5999 Is this an Online or O.T.C.application? Yes
,• . .. Mecham Fixtures :.. ;, f;>,
Air Conditioners-Stand Atom 1
PERMIT EXPIRES Sunday,25 August,2019
Permit Issued on Tuesday,February 26,2019
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
as i ton a Kie Ci of Federal Way.
Owner or agent: O L I Date:
4."AS 'THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
. CITY OP vvay
INSPECTION REQUESTS:(253)835-3050
PERMIT#: 191'00905 00 Address: 32510 10TH PL S
Project: VERA ELSIE CHAVEZ FEDERAL WAY WA 98003-5940
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE TillS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) ID Gas Piping(4125) Q Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date By L/ Date " f1'/
•
•
0 Rough Electrical 0 Final Electrical [J Right of Way
Approved Approved Approved
By Date By Date By Date