19-101551 Mechanical
City of Federal Way Permit #:19-101551-00-ME
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 FILEInspection Request Line: (253)835-3050
Ph.(253)835-2607 Fax:(253)835-2609
Project Name: LUCAS
Project Address: 540 S 302ND ST Parcel Number:064300 0100
Project Description: INSTALLING DUCTLESS HEAT PUMP.
•
Owner Applicant Contractor
BARBARA LUCAS NIKKI HYETT-SCHNELLWASHINGTON WASHINGTON ENERGY SERVICES CO
540 S 302ND ST ENERGY SERVICES CO (GENERAL)
FEDERAL WAY,WA 98003 3909 196TH ST SW WASHIES85INS(9/7/19)
LYNNWOOD WA 98036 3909 196TH ST SW
LYNNWOOD WA 98036
Additional Permit Information
Mechanical Work Valuation? 5500 Is this an Online or O.T.C.application? Yes
Compressors/Heat Pumps
PERMIT EXPIRES Monday,30 September,2019
Permit Issued on Wednesday,April 3,2019
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
shington and the Ci of Federal Way.
Owner or agent: NLI E Date:
7
i& THIS CARD IS TO REMAIN ON-SITE
uCITY ra'way
COnstrINSPECTION REQUESTS:(253)835-3050 Record
PERMIT#: 19 101551 00 Address: 540 S 302ND ST
Project: BARBARA J LUCAS FEDERAL WAY WA 98003-4053
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) ID Gas Piping(4125) El Final-Mechanical(4065)
Approved Approved to release test
Approved
By Date By Date
BYliA/ Date
•
o Rough Electrical El Final Electrical 0 Right of Way
Approved Approved Approved
By Date By Date
By Date