Loading...
19-101487 Mechanical City of Federal Way Permit #:19-101487-00-ME Community Development Dept. FILE 33325 8thhAve S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph (253)835-2607 Fax.(253)835-2609 Project Name: GARDEN TOWNHOMES UNIT 9-4 Project Address: 2537 S 288TH ST Parcel Number:269800 0360 Project Description: Gas pipe has finish nails shot into gas flex in wall.Perform air test.Cap off all outlets and hold air test.Re-pipe from fitting to fitting,fireplace line.Restore connections with all appliances and test. • Owner Applicant Contractor ELIZABETH ALEMAYEHU DOTTIE PEASEHUNNY DOO! HUNNY DOO!HANDYMAN SRVCS LLC 2537 S 288TH ST#4 HANDYMAN SRVCS LLC HUNNYDH906C2(2/28/20) FEDERAL WAY,WA 98003 22534 DORRE DON WAY SE MAPLE VALLEY WA 98038 PO BOX 708 ISSAQUAH WA 98027 Additional Permit Information Mechanical Work Valuation9 1650 Is this an Online or O.T.C.application9 Yes MgiaaacRl. ,'•n ipi i.''•F%;�rji/Jf'.'^•.., Fireplace Inserts 1 Furnaces 1 Hot Water Tanks 1 PERMIT EXPIRES Saturday,28 September,2019 Permit Issued on Monday,April 1,2019 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of W s ing n t ity of Federal Way. Owner or agent: O Date: t • . 4400A THIS CARD IS TO REMAIN ON-SITE Federal Way Construction Inspection Record INSPECTION REQUESTS:(253)835-3050 PERMIT#: 19 101487 00 Address: 2537 S 288TH ST Unit 9-4 Project: ELIZABETH ALEMAYEHU FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ` 0 Mechanical Rough-in(4165) •Q 1' Gas Piping(4125) Ej Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date , By 01 Date y S /F 0 Rough Electrical El Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date