Loading...
18-104182 Building - Single Family Community City of Permit #:18-104182-00-SF 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax(253)835-2609 Project Name: BELMOR MHP SPACE 105 Project Address: 2101 S 324TH ST Parcel Number: 162104 9037 Project Description: NEW-Installation of 1296 square foot manufactured home. Owner Applicant Contractor Lender METRO NORTHWEST LP TOM FULKERSONAMERICAN AMERICAN HOME CENTER 2101 S 324TH ST HOME CENTER 406 S 108TH ST FEDERAL WAY WA 98003 406 S 108TH ST S TACOMA WA 98444 TACOMA WA 98444 Census Category:434-Residential alt/add-no change in number of units Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Occupancy Load: Floor Area(sq.ft.) 1,274.00 Additional Permit Information New/Additional Sq.Feet-1st Floor 1296 New/Additional Sq.Feet-2nd Floor 0 New/Additional Sq.Feet-3rd Floor 0 Occupancy#1-Area(Sq.Feet) 1274 New/Additional Sq.Feet-Basement 0 New/Additional Sq.Feet-Deck 0 New/Additional Sq.Feet-Garage 0 New/Additional Sq.Feet-Other 0 Is this an Online or O.T.C.application', No New/Additional Sq.Feet-Total 1296 Occupancy#1-Use Residence(1 or 2 Comprehensive Plan Designation SF-High-Density family) Residential Total Valuation:7,711.20 PERMIT EXPIRES Wednesday, 10 April,2019 Permit Issued on Friday,October 12,2018 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of �,, Washingtonnandlthe City of Federal Way. Owner or agent'%���"' Pcji..� Date: /0-76.7- 6 4A THIS CARD IS TO REMAIN ON-SITE Feveral Wa Construction Inspection Record y INSPECTION REQUESTS:(253)835-3050 PERMIT#: 18 104182 00 Address: 2101 S 324TH ST Space 105 Project: METRO NORTHWEST LP FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 SWM Precen Site Mtg(4400) 0 Initial Erosion Control(4365) El Interim Erosion Control(4370) Approved To be done PRIOR to breaking ground Approved By Date By Date By Date El Blocking/Tie Downs(4015) ® Final Erosion Control(4375) El Skirting/Final(4250) Approved 1'/ Approved Approved I By j Date I l' By Date By Date 4/ ,/tc `8-1 kv15teRfal-ilw 0 Rough Electrical ❑ Final Electrical Right of Way Approved Approved Approved By Date . . By Date By Date Page 1 of 1 I(I'aZar1&Associates, Inc. Field Geotechnical Engineering•Environmental Engineering Report NO.:06618219DFR682018MS Construction Testing and Inspection DATE: 6/8/2018 Set Count: CONTRACTOR: Belmar Park Golf/Country Club PROJECT#: 06618219 PERMIT#: N/A PROJECT: Belmor Park Lot 105 INSPECTOR: Michael Sadac LOCATION: 2101 S 324th St JURISDICTION: Federal Way KA P.M.: WBT WEATHER: Cloudy TEMP:57 Arrived on site at 7:00 a.m. for soil compaction testing. At the time of arrival, structural fill had already been placed and compacted. Material consisted of CSTC and appeared to be very dense and unyielding. Conducted 2 IPD compaction tests using a Troxler 3440 nuclear density gauge. Client representative was on site to observe the tests. Both tests met the required 95%compaction. Refer to compaction report 06618219SCR682018M5 for details on test locations and other information. .� -�„., .:,:-:.,,,,A:.,;:.:43-.-,74 :'s'_H3�lf'rt.3✓a. 7 P,;f>'# ti ' '�^`�'.,,,-�.'f.'K 1.4rttr' r e.:,Vtu,.; .,f4V} tx."a ++►Iii �:r c,,444,...'" 4: t .” k: ir!;.. p, ; y '��s_ a - ' ti ," - r�` . t�R'4pft3 • �, �iL�'�-£ �iA" �J. Reviewed By: 1,/(_ ASTM Test#: Asset Number(s): To the best of my knowledge,the above WAS performed in accordance with the approved plans,specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425)485-5519 • Poulsbo (360) 598-2126 •Tacoma(253) 939-2500 The information presided on this report is prepared for the excitant use of the chem This report may not be rproduced m an format ra Shout the written permission of the chew and Krum&Assocrsa The rpat indicates ow Inspectors obsen anon and testing raultt basad on site condatas and contractor annum TMs information is subject to review pnor to final submittal Bs-aping the repot.ow Inspector does not accept raposbiloy for validity of tenths The same information has been provided by others on sae 3 1 Z 00 -- C; -0 ,%:, ....te N 60 ,, , ‘Ii NI .5al 74 CD ‘j E ! .g ,.4 E-i N - ' ,4 1 ' - -9-- ! tv\ -! . ? '414, __ a - ,.; _ , 1 v,..._, , 4 . v a -Q 91 � loif a 814 - - 1 4 a N M I . 't q ..1 0 i st,t, miv) i g• E III ill 1 C) „\ 1 Oct, .9 ° "N°I E q i 4. i 6 il 1 el 1 till -c 4. A - IA -i ' A „k ,.;) 4 ,a1.4 ot i FII ill\ZIn1141;1+ 1 , L, g'sl, 1 a HANN N A \ RN CI ifik 1 W El n ,1 if! g 44 4 i - , Q .„..y.....; -.. 1 \ Nk nil ie M H0 Ni 1 OF lit 4 A '1%61 e,X ,! 0 4 1 .4 i ) N 11 cr' lei fit ›..,. lb e4 g L. 4. , 1 \-k) it JN s'J 1 -4 (\ i'N 1 V•Z K As 11 isl irs '`Iq ' q `A ‘),. \9 LI \t kL . Lai 61 . 94. 11 04 vi 0 ‘., .a,_, k 1 0 . v., LI ‘-, !IR isl „ I% , A -4 . -,--: 0 i-c7. N 1 V Z. ./. ,ii 1 ti , - " U1 03C N -� < gat a 0> " Ell a) \i+f-- -- 1 1\E 3 R 1&)4 : -z 1.z E tr, it .1,0 ‘; 0 C tWi ` O \ U� u.' • y s d g. tg, irli , ._,,,,-) 1 lu) ul. , c) kj . I 4 a.* i.,11.1 , ') o� w `LOQ , c11 rl V 9 - ill tit. k .2 tV 0 •-z-fill D " IFO'=4:z111 Lin Lid 114 ___ .zt,.. jetiii , 11 i 1 u (4 t IV • 11:a. t qiiiIiii i , z °Q I ' ;' " i g g 1 9 1 g .2 i cd I thi il'ha ' \ F‘ i i ° 'zi1:4 r'' 7h, its.” I'lit . . ,!' i > W A �' rt in - - =qIji c 1 oi Q 1 1 114' filItig " :� a tt- 1 w �a z 80 1g .- g„ 1 wEti 1 i N o b�. a1�1.0 t $ .401�9 8 m d MECHANICAL PERMIT varus oFMscxAlvlcAL WORK $ Indicate how many of each type offixture to be installed or relocated as part of this project. Do not include existi AIR HANDLING UNITS FANS ng Mures to remain GAS PIPE OUTLETS OTHER{Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS ica�mawA HOT WATER TANKS call BOILERS FURNACES COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES PLUMBING PERMIT yaws OF PLUMBING WORK Indicate how many of each type offixture to be installed or relocated as part of this project. Do not include exist{ n9fixtures to remain. BATHTUBS frig Tub/Samar C.nb.) LAYS(Hand sinks) TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe) DRAINS SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS SINKS pc, /uw;ty) WATER HEATERS(et.m;y HOSE BIBBS SUMPS WASHING MACHINES TOTAL=rums GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OP EXISTING IMPROVEMENTS $ EX:ISTING/PRSQIOUS USE LOT SIZE(In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? ❑Yes❑ No ❑Yes 0 No RESIDENTIAL - NEW OR ADDITION -AREA DESCRIPTION[n sgoa fEet :1 S-Ta I:It$PaS — - — - FIRST FLOOR(or Mobile Home) ---6— /2 i (2 C0'VERED ENTRY GA1RAGE El CARPORT .. •• • 4 4.tC 'tri T* Area .. +:tir. . ."...4.1 -.Zit' , :mu.:aa f'` ��IV.,s,'� .�.:;:1:�-'' _ Totals I ate ' -*orw _ I ESTIMATED SELLING PRICE$ #OF BEDROOMS 2'. CCOMMERCIAL—NEW/ADDITION .REA DESCRIPTION Area Occupancy Group(s) Construction of '-..1_'.-. in Square Feet p cY ,f •. 4. Stories AdditaFonal Information . ADDITION • C(?1VIlV ERCIAL—REMODEL/TENANT IMPROVEMENTS AMU DESCRIPTION Area #of in Square Feet Occupancy Group(:) '...F.':: :4:,;":".„, , x_e T Pe Stories Additional Information 1�++�ppT,��,ENKKA..NT AREA ONLY RnlIetin#1()0—Isinttary 1 7A11