Loading...
15-103733 • mechanical Oof Waalay ,mu &Econ.Dev.Services FILE Permit #: 15-103733-00-M E 33325 8th Ave S Federal way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 p q Project Name: TEMPLETON 3&9a? Project Address: 408 SW 327TH PL Parcel Number. 926491 0150 Project Description: Install a 11kW generator and associated gas piping Owner Applicant Contractor MICHAEL A TEMPLETON ERIC JOHNSON WASHINGTON ELECTRIC LLC(GENERAL) PO BOX 203 WASHINGTON ELECTRIC LLC WASHIEL879BW(1/16/17) KENT,WA 98035 12501 SE 299TH PL 12501 SE 299TH PL AUBURN WA 98092 AUBURN WA 98092 Additional Permit Information Is this an Online or O.T.C.application Yes Mechanical Fixtures Gas Pipe Outlets 1 CONDITIONS: A permanently installed generator is not allowed to be placed within required yards(setbacks). See Bulletin #150 for placement details. PERMIT EXPIRES Saturday, January 30, 2016 Permit Issued on Monday,August 3, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: I I E Date: • 1S4 � NPtoe° THIS CARD IS TO MAIN ON-SITE CITY OF 4A0Construction In ection Record , Federal Way INSPECTION REQ TS: (253)835-3050 _ PERMIT#: 15-103733-00-ME Address: 408 SW 327TH PL Project: MICHAEL A TEMPLETON FEDERAL WAY, WA 98023-5643 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ Mechanical Rough-in(4165) ❑ Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved By V4 Date tiff IS By VAS Date Oki (r By IAAS Date g'¢ ( Cs • 0 Rough ElectricalEl Final Electrical Right of Way Approved Approved Approved By Date By Date By Date