19-100669 Mechanical
City of Federal Way Permit #:19-100669-00-ME
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 FILE — Inspection Request Line: (253)835-3050
Ph.(253)835-2607 Fax.(253)835-2609
Project Name: HAJHEIDARI/GHODSI
Project Address: 555 SW 334TH CT Parcel Number: 729801 0370
Project Description: Replace existing gas furnace
•
Owner Applicant Contractor
SAFARALI HAJHEIDARI JAIMIE HOWBRENNAN HEATING&A/C BRENNAN HEATING&A/C LLC
555 SW 334TH CT 4601 S 134TH PL (GENERAL 01)
FEDERAL WAY WA 98023 SEATTLE WA 98168 BRENNHA971R9(12/29/19)
USA 4601 S 134TH PL
TUKWILA WA 98168
•
Additional Permit Information
Mechanical Work Valuation? 2599 Is this an Online or O.T.C.application9 Yes
•
,
Me+ehtlrilcal.Fiat>lllr(es: ;13 ,;
;3. :'t
Furnaces 1
PERMIT EXPIRES Sunday, 11 August,2019
Permit Issued on Tuesday,February 12,2019
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Wang an ity of Federal Way.
Owner or agent: ON hiDate:
.
THIS CARD IS TO REMAIN ON-SITE
low
Construction Inspection Record
CITY Or 1 •
INSPECTION REQUESTS:(253)835-3050
PERMIT#: 19 100669 00 Address: 555 SW 334TH CT
Project: TAHEREH GHODSI FEDERAL WAY WA 98023-6178
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the bade of this card.
0 Mechanical Rough-in(4165) DI Gas Piping(4125) El Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date By‘ 11s Date -
•
El Rough Electrical 0 Final Electrical D Right of Way
ApprovedApproved Approved
By Date By Date By Date