12-105360 V >_g t z 2g Building = S iiig1�Sanyding
City tf Federal Way
dommunity&Econ.Dev.Services Permit #: 12-105360-00-SF
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: 253
Ph:(253)835-2607 Fax:(253)835-2609 � � � p Q ( )835-3050
Project Name: QUALITY HOME SOLUTIONS NORTHWEST INC
Project Address: 2428 SW 330TH ST Parcel Number: 894500 0980
Project Description: REM-Renewal of Permit#11-100486 for"garage conversion into master bedroom and
bathroom,windows.To include plumbing and mechanical."
Owner Applicant Contractor Lobs
QUALITY HOME SOLUTIONS NW QUALITY HOME SOLUTIONS NW ASK RICH LLC ROBERT&JENNIFER TENCZAR
1515 HARRISON ST ST STE 114 INC ASKRIRL883DO(3/20/14)
SUMNER WA 98390 515 HARRISON ST 4711 N 46Th ST
SUMNER WA 98390 TACOMA WA 98407
Census Category: 434-Residential alt/add-no change in number of units
Includes: #1 #2 #3 #4
Occupancy Class: R-3
Construction Type: Type V-B •
Occupancy Load
Floor Area(sq.ft.) 820 0 0 0
Additional Permit information
New/Additional Sq.Feet-3rd Floor 0 Occupancy#1-Area(Sq.Feet) 820
New/Additional Sq.Feet-Basement 0 Occupancy#1-Construction Type. Type V-B
Mechanical to be Included? Yes Occupancy#1-Class R-3
Plumbing to be Included? Yes Occupancy#1-Use Residence(1 or 2
family)
Mechanical Fixtures
Ducting 1 Fans 2
- Plumbing Fixtures
Bathtubs 1 Dishwashers. 1 Lavatories 1
Sinks 1 Water Closets 1
•
CONDITIONS:
Subject to field inspection with plans.
PERMIT EXPIRES Saturday, June 1, 2013
Permit Issued on Monday, December 3, 2012
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
• the City of Federal Way.
Owner or agent: Aim. AMP miff' Date: /�-/i 31 j
(Ologel
4/t /I�
. • THIS CARD IS TO MAIN ON-SITE ,
CITY OF • Construction In ection Record ',
Federal Way INSPECTION REQ TS: (253)835-3050
PERMIT#: 12-105360-00-SF Address: 2428 SW 330TH ST
Project: QUALITY HOME SOLUTIONS NW FEDERAL WAY, WA 98023-2828
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 SWM Precon Site Mtg(4400) "Ei Initial Erosion Control(4365) El Plumbing Groundwork(4190) `
Approved To be done prior to breaking ground Approved to cover
By Date By Date By Date
. . . . .
0 Underfloor Framing(4285) El Floor Sheathing(4105) El Shear Walls(4245)
Approved to sheath floor
�/ G,,Approved to install flooring Approved to install siding
By ij� Date l2- 7 1Z. By / t!" Date/Z../D /2 By fj,� Date t2-`p.�a
`O Roof Sheathing(4220) �0 Rough Plumbing(4230) '❑ Mechanical Rough-in(4165)
Approved to install roofing Approved Approved
By Date By Foe- Date f-J// By r-rf Date /2..-//—(2,
0 Gas Piping(4125) 0 Fire/Draft Stops(4095) 0 Interim Erosion Control(4370)
Approved to release test Approved Approved
By 0_,94....) Date 3 _a l...-_0 By fi,f Date /2-1/-12 By Date
Prior to scheduling a Framing inspection; , Framing(4120) Insulation(4150)
I
lectrical,Plumbing&Mechanical Rough-in and Approved to insulate Approved to install wallboard
irelDraft Stop inspections must be signed-off and r
approved. IBC 109.3.4 EB i
y Date/Z///y By �e 44 Date/Z-/3./2__
El Gypsum Wallboard Nailing(4130) ❑ Final Erosion Control(4375) ❑ Final-Mechanical(4065)
Approved to install mud&tape Approved Approved
By `� Date /21'7/a_ By Date By Ct_...‘a Date j_2Q t,b
0 Final-Plumbing(4075) 0 Final-Building(4050)
Approved Approved
By "2.ir Date 9 773 By /4Date 9'-/-/3
•
•
1=IRough Electrical El Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date