11-102879 ' Building - Multi Family
CWay
Communit Devof eopmderalentServices , Permit #: 11-102879-00-MF
PA Box 9718
Federal Way,WA 98063-9718 (253 Inspection Request Line:
Ph:(253)835-2607 Fax (253)835-2609 P 9 ( ) 835-3050
Project Name: CELEBRATION PARK APARTMENTS-BLDG 32335
Project Address: 32331 11TH PL S Parcel Number: 172104 9127
Project Description: REP-Tear off existing composition roof system down to plywood decking and install new
composition roof system
Owner Applicant Contractor Lender
JOHN C DAVISCOURT NORTHWEST ROOF SERVICE INC NORTHWEST ROOF SERVICE INC
515 3RD AVE S PO BOX 1697 NORTHRS088DW(10/15/11)
EDMONDS WA 98020 KENT WA 98035 PO BOX 1697
KENT WA 98035
Census Category: 555 -Non-structural roofing per
Includes: #1 #2 fi, • #4
Occupancy Class: .„_ A
Construction Type:
iiVP
Occupancy Load:
Floor Area(sq.ft.) 0 drCidi0 0
Ego‘11.1144/474:01k
II ,� fi
.� 'fe.MY lI' A.I 4, ,F' �r. F , � �,
E3t
WrI
Mechanical to be Included' No .- of Stories 2
Permit for Building Shell Only? vs iv' mbing to be Included? No .
New/Additional Sq.Feet-Total Zoning Designation RM 11300
'0'..''':' : 4:: ?!*'::* ..
;g� *'::* «�,.: !<.. >,. !;::'` ..:ai,,i •.:i. ., .,!r.;
.: 1` ♦•fir ;, a, - :•,sus 3;; iI. 'lid• : •"l�li:: <..; ' ..t:l � *.,:.-4,'," ,,,.!,,, ," `•:,'
y�,< 'k. ::`:I•"-,ta`q; 1a77rp�"^'\
•
A,
E- IT EX S Saturday, January 14, 2012
Perms ed on Monday, July 18, 2011
I hereby certify th e - . , e information is correct and that the construction on the above described property and
the occupanc and t -e will be in accordance with the law , rules and regulations of the State of Washington
/ and h- City of eral Way.
Ow _. I t: _ et V, AA li
_/ _ _ Date: l (i /
6-77.2.70/,,
. Abb. THIS CARD IS TO REMAIN ON-SITE '
CITYOF "� Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT#: 11-102879-00-MF Address: 32331 11TH PL S
Project: JOHN C DAVISCOURT FEDERAL WAY, WA 98003-8455
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
• SWM Precon Site Mfg(4400) 0 Initial Erosion Control(4365) 0 Footings/Setback(4110)
Approved To be done prior to breaking ground Approved to place concrete
By Date By Date By Date
O Foundation Wall(4115) ❑ Drainage/Downspout(4040) Re-steel(4215)
Approved to place concrete Approved to backfill Approved to place concrete or grout
By Date By Date By Date
O Slab/Concrete Floor(4255) ❑ Underfloor Framing(4285) Floor Sheathing(4105)
Approved to place concrete Approved to sheath floor Approved to install flooring
By Date By Date By Date
O Shear Walls(4245) Roof Sheathing(4220) Fire/Draft Stops(4095)
• Approved to install siding Approved to install roofing Approved
By Date By , Date *.i_ /J By Date
O Interim Erosion Control(4370) Framing1 JJ 4120
Prior to scheduling•a Framing inspection; ( )
Approved Approved to insulate
Electrical,Plumbing&Mechanical Rough-in and•
Fire/Draft Stop inspections must be signed-off and
By Date approved. IBC 1093.44 By Date
El Insulation (4150) 0 Gypsum Wallboard Nailing(4130) 0 Suspended Ceiling Grid (4265)
Approved to install wallboard Approved to install mud&tape Approved to drop tile
By Date By Date By Date
,0 Final-Fire Department(4060) 0 Final Erosion Control(4375) El
Final-Building(4050)
Approved Approved Approved
By Date By Date By Date
•
El Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date
A
Asian 1
S 321ST PLa. State *Pr.ts# CO ,
Centennial
0 a
I" ! Bldg. Bnk
,„... .4
021
.11..
..., ,
, , ., -
, ,8 32017
'/• 4ili- .'--..,
,.•.1
> ...., ,
/
' ,,A;-% ,
I
/I
,: / Wo ,;/'':'"r4
I.---.> ' y4,,: ,---
5.4
/•
+A i !,
$
tf'''')\\i/C0 - * .A. Nt• ;;
-
% ' occ`•z/Ne-t.;-' . ' ',4': -'<:: :C,Iebration --
. ,.
;.:<,: ,, ;4'ff.;„': . i,. .!! e,". • '
:,c.':,.,7 \ 7„ .P.,;* :‘,p.ark eway, -., ,,,%,,,..• -,: -
• - 't ", , ..4,-- ,,,'
< '- ,,, Apartments •,-,* -.A4.Ati;LV't-k; ,'. .•.t.;4`,:•'' `..• *,
44 '• /er•.... , :l' i.E444'17,V,','`,''u‘!,'' 'l',,,1 '.• . , ,''.
i'..!"•''
I ,
. .
M.4 '' ; ; - i U)
.2' 'Z'f . ,e fg
' ' " k"" 47 i I lt e ,
,//,':;.. '•`<,, S). ;
,'
< . ;
y • e Er;
•: 't i a' L 'i k4.:1>W«„
; . - ! v i
..-,,,
040;r
fv;e-
. .., ;.;uc. i T"* - -
S 322ND PL, :-7,1.;‘!, t '1•
31 i ,,A
—.0 'e;9r,;A 1<.'t*
\
*, ''..;;;ftt ..<
i rrly
Z : !
o S 324TH PL
'N,M.; ' '' '4';,,t
. ,
17 , ,,,,,i ,,,i „'.z;'. ,— 0I
'< :;,.,3 ;:' -7.7 '-r:"7:7",
'.:;:t',
to !•, " 34$1 5 :..„,
,.‘
,..
.. \., ,:,,::, -, -:•,,c, -,,
4,...n.
K,,;' 4, , . .;,-4.: .,
! „ 4=0 """-- ‘‘<,A < ,7";,:•,:r' \ '., ' , , ., - -'
.6!' 4f,‘ 0)
,1 '`i,
„ .
.,----'occ -,•-- -,,-
\ , />
„ , . 40
•\,..: ' ftbit:;-/ ,,, f
. N."<\' •tp' ' 1-
,„ Pe), .,,,7.2e, ,,' ;, ,7 tr • ','),. ,
tO
<. s s* W^'''''
c‘i
”; tp .4.);,,, • to . , co
' • cn
,.,
"- „ 4c /'' r'''' #• 4i o
' ', • ',0 ' ''," 's ,
\ , 4,#. „ :i•
, .V
'' •'5' )'J''1 ,' 2 i.
•/ , ' *Sr,'''' /L''1')'', '''' ,
#Or Celebration Park
...
, n_A • ,---,VZ, o
4,47/...‘ ,
00000 ,'
. \':' '‘ -' • ...
- •• Ts'
\,,,,' _e •• • ' ' 2
, .- - --- ---- . ' \ •- to'
i. -
)/ ..%6‘ ., ,ss .
ao -, c?
CELEBRATION PARK APARTMENTS ..L..\ Scale: 2
"Viit f2
N 0 55 -no Feet E ..
32205 11TH PL S - Units: 248 1 I I (3
5
,
07/15/2011 14y57 FAX 2538503580 NORTHWEST-ROOF-SERVICE I _ [ 0 z 03
dy • PERMiT 0 ME PL DE EN FP
cof=DOVP2sORWIT-SERVICES APPLICATION * WI ft let ok_ /tf We Pk
4 207.PAX 2,534885-2609
YAMAtiessiStfgESUNn
(k LI II
satkotho-r_
- 2 3 a 1 IP'. PL cDwhe\.
P OJ*CiT VALUATION ZONING AaaraeOA's TAX/PAP.CXL I
s 14 D to 0 2_ 1 0 1 - 9 I Z 2
40600-Or�?$1 T y%BUILDING Ci P ti 0 MEC1 ICAL
•
0 DEMOI T1ON 0 Ig.NOWIRIPM 0 FIRE PEEVEIMtON
1aair" -1 R RCT \ �/
(Tomtit Ndme/Xo»uoumerLast Warns) (1n, „ ' OI^ k0"1k V1 /J, 3223
4,444par BES RwrION \✓�Jll�l�'I� . : rev. I .1 �J�Gita a +w
'dWestription of work to r OY4 CA ` W00. /' , ‘r ICiS�"znl
be-included on this permit only
y
NAut3 an IDA V i S C bl k— PRIawANY ANON`
PROPERTY OWNER 243—g3 q1 -4y(00
MARANO O ADDAZes S- L
SIS 3''�-nY.2 .
ND► R - - 0 vim NASIZ 1V.C. 2c --$59-o 03 _
MAILING ADORNS, Z•IiAIL
CONTRACTOR . V• N I�Y,d=,.e hw12no .COM
TAX
t mP,.,81)32- 2r3 — --3c
WA STATIC CONTRACTOR'S LlcsNas I EXPIRATION DATE IntIMMAL�O � s / �� 7,x-os
d!`}�LI
N oDO-I3 i-
Y�TN R sbB$D�rJ
NAME PHONE
APPLICANT summit;ADDRsae SWAM
CITT aTATL ZIP TAX
PROJECT CONTACT xwxs !Harts r
(The individual to receive and r"� An-Ali �V�!�1— 1 IS '—d✓9 ---Ti U3
respond to all correspondence MAILING ADDRZse �,, ,, Z-MAIL i I
concerning this application) S�7Mb€i as C.2' k,2 o r T
CITY it STATE ZIP
Y i` PAX t`
ALTZRNATZCONTACT NAND: PEON! t� Z-MAA' 11
PROJECT FINANCING mum
Required value of$5,000 or more N ❑ OWNLrR,FIIIANCLrD
(RCW I9.27,095) MAILING,ADORNS*,CITY,STATS,ZIP MONS
1
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the lest
of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit.I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim(including costs, expensesand attorneys'fees incurred in
the investigation and defense of such claim),which may be made by any person,including the undersigned, and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
Information supplied to the ci• • a part of% is application.
SIGNATURE: 7/ /
7 i
DATE / Its I I
PRINT NAME: I?.AA 0C1 ri - C fr
Buticnn#100—January 1,2011 Page 1 of 3 k:\!-landouts'Permit Application