Loading...
13-101115 • Mechanical City of Federal Way Community A Econ.°ev'Serves FILE Permit #: 13-101115-00-M E 33325 8th Ave S Federal Way,WA 98003 Ph:(253)835-2607 Fax(253)835-2609 Inspection Request Line: (253)835-3050 Project Name: MORTENSEN Project Address: 4226 SW 328TH ST Parcel Number. 873201 0390 Project Description: Replace existing gas furnace and install A/C unit and gas water heater Owner Applicant Contractor RICHARD MORTENSEN • JAIME HOW BRENNAN HEATING&A/C LLC PAMELA MORTENSEN BRENNAN HEATING&A/C (GENERAL) 4226 SW 328TH ST 4601 S 134TH PL BRENNHA971R9(12/29/13) FEDERAL WAY WA 98023-2629 SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional Permit information Is this an Online or O.T.C.application? Yes Mechanical Fixtures Air Conditioners-Stand Alone Un 1 Furnaces. 1 Gas Piping 1 Hot Water Tanks. 1 PERMIT EXPIRES Wednesday, September 4, 2013 Permit Issued on Friday, March 8, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent Of1 L I N E Date: rFINALED THIS CARD IS TO MAIN ON-SITE •;. IP�r� WayConstruction I ection Record Federal INSPECTION REQ TS: (253)835-3050 PERMIT#: 13-101115-00-ME Address: 4226 SW 328TH ST Project: RICHARD MORTENSEN FEDERAL WAY, WA 98023-2629 Scheduled inspections may be failed if this card is not on-site. p0 NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. D Mechanical Rough-in(4165) ❑ Gas Piping(4125) ❑ Final-Mechanical(� Approved Approved to release test derFs4 Approved By Date By � Date 3' 11.- I3^^ By Dat/e f ❑ Rough Electrical Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date