Loading...
11-100405 • City of Federal Way 110 • Mechanical Community Development Services L h Permit #: 11-100405-00-ME P.O Box 9718 Federal Way,WA 98063-9718 Ph:(253)835-2607 Fax:(253)835-2609 Inspection !Request Line: (2 53)835-3050 Project Name: HEINEN agKrbY Project Address: 28965 11TH PL S Parcel Number: 515230 0010 Project Description: Replace existing gas furnace with new gas furnace • Owner Applicant Contractor DOUGLAS R&SHERYL L HEINEN DAVE TREAT AUBURN SHEET METAL INC 28965 11TH PL S AUBURN SHEET METAL INC AUBURI*222RQ(4/30/11) FEDERAL WAY WA 98003-3706 844 S MT.VILLA DR PO BOX 8003 ENUMCLAW WA 98022 BONNEY LAKE WA 98390 • h � :r-F � .4 t' � 8;.., �,... »�'•s.' ♦ F.,e a !,{•:i.['y, w ':�iL.. ntimiwyk Mechanical Valuation 2206 Is this an Online or O.T.C.application? Yes ib• .tt'. • r:'n 'x�'1 z`.,,, ..,���:» .>. :�: _ N��,�� �c<':..;„ t.�ES•�»��;� Furnaces 1 PERMIT EXPIRES Saturday, July 30, 2011 Permit Issued on Monday, January. 31, 2011 I hereby certify that.the above information is correct and that the construction on the above described property and the occuparicy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 0MW N� Date: VS II I FijFIN A DZ/1/11 THIS CARI`i IS TO REMAIN ON-SITE CITY OF 411111 • Construction InsSTtion Record Federal Way INSPECTION REQUE S: (253)835-3050 PERMIT#: 11-100405-00-ME Address: 28965 11TH PL S Project: DOUGLAS R & SHERYL L HEINEN FEDERAL WAY, WA 98003-3706 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El Mechanical Rough-in(4165) ❑ Gas Piping(4125) ❑ Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date B)r-SDat -----7",7 • FILE El Rough ElectricalEl Final Electrical Right of Way Approved Approved Approved By Date By Date By Date