Loading...
11-100700 r •City of Federal Way • Mechanicals Community Development Services Permit #: 11-10b700-00-ME P.O.Box 9718 Federal Way, F 98063-9718 25835Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2809 P q Project Name: LIN-NA 2 FILE "0 1 Project Address: 28610 11TH AVE S Parcel Number: 515296 0660 Project Description: Install Generator Owner Applicant Contractor DANIEL UY LIM DONNA ADAMS ADVANCED FILTER&MECHANICAL INC LU LIN-NA ADVANCED FILTER&MECHANICAL (GENERAL) PO BOX 4215 418 NW VALLEY AVE ADVANFM044RD (12/29/12) FEDERAL WAY WA PUYALLUP WA 98371 418 VALLEY AVE NW UNIT B115 98063 PUYALLUP WA 98372-2503 (tY< • 5.3• ,11161/111/111.a . Mechanical Valuation 2200.00 Is this an Online or O.T.C.application? Yes s .. •<•'i<. ..c. .•gip,'„, `"•3:�+ .. .. _: �''r,v.�.t.:F.»"�», �• 4:.�, Gas Piping 1 CONDITIONS: NOTE: Equipment or structures over 18” in height may not be located in required yards(setbacks). PERMIT EXPIRES Saturday, September 17, 2011 Permit Issued on Monday, March 21, 2011 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 1,4' Date: .tnsto &/'t/i I • THIS CARD IS TO REMAIN ON-SITE • CITY OFA Construction I Sechon Record r d Federal Way INSPECTION RE UETS: 253 835-3050 PERMIT#: 11-100700-00-ME Address: 28610 11TH AVE S Project: DANIEL UY LIM FEDERAL WAY, WA 98003-3139 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) 0 Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved By Date By DateBy C Date 1 • ❑ Rough Electrical 'El Final Electrical LI Right of Way Approved Approved Approved By Date By Date By Date