19-101105 e A
r
Electrical
City of Federal Way Permit #:19-101105-00-EL
Community Development Dept.
33325 AveS FILE
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609 •
Project Name: WATANABE
Project Address: 1825 S 330TH ST Parcel Number: 894445 0150
Project Description: Installation of a low voltage home security system.
Owner Applicant Contractor
SHANE WATANABE PERMITS TEAMPROTECT YOUR HOME PROTECT YOUR HOME(06)
1825 S 330TH ST UNIT B-6 3750 PRIORITY WAY DR S SUITE 200 PROTEYH934RS(12/10/19)
FEDERAL WAY WA 98003 INDIANAPOLIS IN 46240
3750 PRIORITY WAY DR S SUITE 200
INDIANAPOLIS IN 46240
•
Additional Permit Information
Is this an Online or O.T.C.application9 Yes
:_... :. ,... �; � ;fir;'��,�`y.� • ;-s',` '+;,;.
;_,.. . �. .,;- : fir, , � ; �ti. � Y`�==: ..
, '-a • )l , '+x•31„ t:;'.u' ` � -•�a ;.
;
•
Low Voltage-Burglar Alarm 1 " .. . ...
PERMIT EXPIRES Tuesday, 10 March,2020
Permit Issued on Monday,March 11,2019
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
0 hind Eity of Federal Way.
Owner or agent: Date:
/� �/ ict/
•
. i` 4) f
THISCARD IS TO REMAIN ON-SITE
��Way THIS
Inspection Record
y INSPECTION REQUESTS:(253)835-3050
PERMIT#: 19 101105 00 Address: 1825 S 330TH ST Unit B-6
Project: FAYE WATANABE FEDERAL WAY WA 98003-6465
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 UFER Ground(4295) 0 Ditch cover(4030) El Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
® Pool Bonding(4195) b❑ Temporary Power(4275) ® Service(4235)
Approved Approved Approved
By Date By Date By Date
El Feeders/Sub-panels(4045) ® Rough Electrical(4225) ® Ceiling Cover(4020)
Approved Approved Approved
By Date By Date By Date
El Final-Electrical(4055)
Approved
By Date c•17-/9
0 Rough Electrical 0Final Electrical 0 Right of Way
Approved Approved Approved
4 By Date , By Date By Date