19-102004 r
T ..
Mechanical
City of Federal Way Permit #:19-102004-00-ME
Community Development Dept
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph.(253)835-2607 Fax:(253)835-2609
Project Name: DENISTON
Project Address: 2708 SW 332ND CT Parcel Number: 894430 0240
Project Description: Change out of gas furnace,add A/C
Owner Applicant Contractor
J W DENISTON JEANNIE DRAGTAMERICOOL HEATING AMERICOOL HEATING AND A/C LLC
2708 S 332ND ST AND AIR CONDITIONING (GENERAL)
FEDERAL WAY WA 98023-2760 17929 IRWIN ST SW AMERIHA950PO (10/20/19)
ROCHESTER WA 98579 17929 SW IRWIN ST
T ROCHESTER WA 98579
Additional Permit Information
Mechanical Work Valuation? 11400 Is this an Online or O.T.C.application? Yes
Y y
•`, . ce ,.. 5
�. . .,� '",
...'' ; , `, _.�._., � Y .,,, ,, x< M,nm ^.,,,. ?'
Y' ""..{..,
Air Conditioners-Stand Alont 1 Furnaces 1
PERMIT EXPIRES Saturday,26 October,2019
Permit Issued on Monday,April 29,2019
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in aco da ' the laws, rules and regulations of the State of
c:::ytcti
ton h f Federal Way.
Owner or agent: Date:
• r .
,‘ s
11�Mw�
THIS CARD IS TO REMAIN ON-SITE
crrr o�
Federal W Construction Inspection Record
INSPECTION REQUESTS:(253)835-3050
PERMIT#: 19 102004 00 Address: 2708 SW 332ND CT
Project: J W DENISTON FEDERAL WAY WA 98023-2760
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
D Mechanical Rough-in(4165) Q Gas Piping(4125) EI Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date
By15 Date‘,
•
SITE
El Rough Electrical El Final Electrical 0 Right of Way
Approved Approved
Approved
By Date By Date By Date