Loading...
19-102562 +II► . • • Mechanical City of Federal Way Permit #:19-102562-00-ME Community Development Dept 33325 8th Ave S ILIIE Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: WANG/CHENG Project Address: 30023 2ND CT S Parcel Number: 891420 0120 Project Description: Install 4-ton a/c Owner Applicant Contractor HSTANG FA WANG JAIMIE HOWBRENNAN HEATING&A/C BRENNAN HEATING&A/C LLC 30023 2ND CT S 4601 S 134TH PL (GENERAL 01) FEDERAL WAY WA SEATTLE WA 98168 BRENNHA971R9(12/29/19) 98003 4601 S 134TH PL TUKWILA WA 98168 • Additional Permit Information Mechanical Work Valuation9 6949 Is this an Online or O.T.C.application? Yes Mechanical MY ', Air Conditioners-Stand Alont 1 PERMIT EXPIRES Monday,25 November,2019 Permit Issued on Wednesday,May 29,2019 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of 0 no 'd of Federal Way. Owner or agent: Date: !/Gt 4ATHIS CARD IS TO REMAIN ON-SITE Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 19 102562 00 Address: 30023 2ND CT S Project: HUEY CHENG FEDERAL WAY WA 98003-4302 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) ; 2❑ Gas Piping(4125) E] Final-Mechanical(4065) Approved Approved to release test Approved I By Date By Date By 4f6 Date s • 0 Rough Electrical 0 Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date