Loading...
19-102102 4141. t "Electrical Community DevelopmentCity of Way E+r..�»r�e Permit #:19-102102-00-EL 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: DELTA INVESTMENTS LLC Project Address: 32819 22ND AVE SW Parcel Number: 894510 0260 Project Description: PANEL CHANGE.WASHER DRYER CIRCUIT.EXHAUST FAN • Owner Applicant Contractor DELTA INVESTMENTS LLC MIKE LINDERLINDER ELECTRIC LINDER ELECTRIC INC 32819 22ND AVE SW 7004 180TH AVE NE LINDEEI426M8(1/31/21) FEDERAL WAY WA 98023 REDMOND WA 98052 7004 180TH AVE NE REDMOND WA 98052 • Additional Permit Information Is this an Online or O.T.C.application? Yes 1 -. • i .R iY7 rc, .HL%-7M ; r,r'* ,w Alt. Serv./Feeder:0 to 200 ami 1 Circuits-Residential 1 PERMIT EXPIRES Friday, 1 May,2020 Permit Issued on Thursday,May 2,2019 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 4 Date: a k. . . r I . �` THIS CARD IS TO REMAIN ON-SITE r �'�°� Construction Federal W o Inspection Record Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 19 102102 00 Address: 32819 22ND AVE SW Project: DELTA INVESTMENTS LLC FEDERAL WAY WA 98023-2880 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 1❑ UFER Ground(4295) El Ditch cover(4030) 0 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date Q Pool Bonding(4195) 0 Temporary Power(4275) s❑ Service(4235) Approved Approved Approved 4By Date By Date *By ,/1 Date(1/fr1 / 0 Feeders/Sub-panels(4045) 0 Rough Electrical(4225) El Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date , 0 Final-Electrical(4055) oved By /Acute‘19/q O Rough Electrical 0 Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date