Loading...
19-102992 • 46 s«i Mechanical City ty Way Permit #:19-102992-00-MEca„ Development� 33325 8th Ave S Federal Way,WA 98003 �' Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: HOLMES Project Address: 32104 2ND AVE SW Parcel Number: 926490 0180 Project Description: Replace existing gas water heater Owner Applicant Contractor JAMES S HOLMES JAIMIE HOWBRENNAN HEATING&A/C BRENNAN HEATING&A/C LLC 32104 2ND AVE SW 4601 S 134TH PL (GENERAL 01) FEDERAL WAY WA 98023-5602 SEATTLE WA 98168 BRENNHA97IR9(12/29/19) 4601 S 134TH PL TUKWILA WA 98168 • Additional Permit Information Mechanical Work Valuation? 2002 Is this an-Online or O.T.C.application? Yes i. ta•;,' K•,'?ytw`if:x c .x, ,.:z'si ,, ,y�r�Y '.;:xx", is. ..*11 ,it rr 7.!° '7�', .tF 74,04*,y�. 3z. .s.afi s,+,•:'.z.:$.,':.;�;• ' �:¢ ,u,,•., yE.{I�j�tj;ip'( �" 'nt..� Q .»3'" �..G ;�,: :>t ,'iT M 's''i ,,.t;= ts; ,04* .', F; Q}n 1; .1'" �P.l r ":•n'Y..�^ a. ''•f:'i,r. q , °.z.. �e�tktu�".�.'�.'o�.E'. f�>kr:�'+"x,$v;' • Hot Water Tanks 1 PERMIT EXPIRES Tuesday, 17 December,2019 Permit Issued on Thursday,June 20,2019 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Wcy �e[tJFEal Way. Owner or agent: Date: �n44' THIS CARD IS TO REMAIN ON-SITE """�' Construction Inspection Record Federal Way INSPECTION REQUESTS: (253)835-3050 PERMIT#: 19 102992 00 Address: 32104 2ND AVE SW Project: BARBARA L HOLMES FEDERAL WAY WA 98023-5602 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) 0 Gas Piping(4125) 0 Final-Mechanical(4065) • Approved Approved to release test / Approved By Date By Date By/ �(J,5 Date 20 0 Rough Electrical 0 Final Electrical [J Right of Way Approved Approved Approved By Date 0. By Date By Date