19-102706 J
Electrical
City of Federal Way FILE Permit #:19-102706-00-EL
Community Development Dept
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax (253)835-2609
Project Name: BEST BUY
Project Address: 31601 PACIFIC HWY S Parcel Number:082104 9196
Project Description: Disconnect power from outdated/unsupported fixture displays in home theater.Nintendo
Smiles to Aisles: Disconnect/reconnect power,ensure EMS&24/7 power is available.
Disconnect/reconnect power to all relocated LGBs,products,and fixtures.
Disconnect/reconnect new POS as needed.Reroute Apple Flatewire if indicated.Run additional
Quads to ends,and center of lowbays with cameras or camcorders.Disconnect/reconnect power
to all hurricane fixtures being replaced or relocated.Install 24/7 and EMS quad boxes for new
Amazon and Google Connected Home displays.Disconnect/reconnect to new locations of POS
desk,and PPMS/ME tables.
Owner Applicant Contractor
HARSCH INVESTMENT PROPERTIES LLC LIN ROGERSLIN R ROGERS ELECTRICAL LIN R ROGERS ELECTRICAL INC
PO BOX 2708 CONTRACTORS INC (ELECTRICAL 01)
PORTLAND OR 97208 2050 N MARCONI DR SUITE 200 LINRRRR956B 1(1/29/21)
ALPHARETTA GA 30005 2050 N MARCONI DR SUITE 200
ALPHARETTA GA 30005
Additional Permit Information
Is this an Online or O.T.C.application9 Yes
E�neal F es ;,'
Circuits-Commercial 1
PERMIT EXPIRES Friday,5 June,2020
Permit Issued on Thursday,June 6,2019
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washin ton an th Federal Way.
Owner or agent: Date:
`THIS CARD IS TO REMAIN ON-SITE
Federal Way Construction Inspection Record
y INSPECTION REQUESTS:(253)835-3050
PERMIT#: 19 102706 00 Address: 31601 PACIFIC HWY S
Project: HARSCH INVESTMENT PROPERTI FEDERAL WAY WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
UFER Ground(4295) El Ditch cover(4030) 0 Slab/Concrete Floor(4255)
Approved Approved P'Pr Approved to place concrete
By Date By Date By Date
® Pool Bonding(4195) Q Temporary Power(4275) •Q Service(4235)
Approved Approved Approved
By Date By Date By Date
❑ Feeders/Su anels(4045) 8 RoughElectrical 4225
� ❑ ( ) ❑ Ceiling Cover(4020)
Approved Approved Approved
By Date . By Date By Date
•
E0 Final-Electrical(4055)
Approved
By <% Date?24~/? .
•
0 Rough Electrical ❑ Final Electrical ❑ Right of Way
Approved Approved Approved
By Date By Date
By Date