13-104010 • Electrical
City of ay
Community a Econ.DFederalevW.Services Permit #: 13-104010-00-EL
33325 8th Ave S
Federal Way,WA 98003 FILE
Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253)835-3050
Project Name: WYNSTONE EAST LOT 68
Project Address: 802 SW 339TH ST Parcel Number. 957850 0680
Project Description: 200 A u/g New Residence
`
Owner Applicant Contractor
LENNAR NORTHWEST INC RON CARNINO PRECISION ELECTRIC ENT INC
12815 CANYON RD E SUITE F PRECISION ELECTRIC ENT INC PRECIEE984L5(6/25/14)
PUYALLUP WA 98373 3205 GARFIELD ST 3205 GARFIELD ST
ENUMCLAW WA 98022 ENUMCLAW WA 98022
Additional Permit Information
Is this an Online or O.T.C.application Yes Is Use Educational or Institutional? No
Electrical Fixtures
New Service:Residential 2,501
PERMIT EXPIRES Monday, March 10, 2014
Permit Issued on Wednesday, September 11, 2013
I hereby certify that the above information.incorrect and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
ONuNblEandthe Cral Way.
Owner or agent: Date:
4 THIS CARD IS TO MAIN ON-SITE
CITY OF 1A
Federal WayConstruction In ection Record
INSPECTION REQUE TS: (253)835-3050
PERMIT#: 13-104010-00-EL Address: 802 SW 339TH ST
Project: LENNAR NORTHWEST INC FEDERAL WAY, WA 98023
Scheduled inspections may be failed if this card is not on-site. p0 NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
O UFER Ground (4295) 0 Ditch cover(4030) Ei Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
B�� Date l 6--7(„3 By Z(7 Date f b 4._,is . By Date
❑ Pool Bonding(4195) ❑ Temporary Power(4275) El Service(4235)
Approved Approved Approved
By Date By Date By Qtr, Date Z_.1--,,
•
o Feeders/Sub-panels(4045) El Rough Electrical(4225) 0 Ceiling Cover(4020)
Approved Approved Approved
By Date By C-, 1,4,, Date ) 2_ 2___1 By Date
'
Final-Electrical(4055)
Approved
By Date ca,...
1
O Rough Electrical Final Electrical El Right of Way
Approved Approved Approved
By Date By Date By Date