Loading...
13-104961 • ° SITE' �` Electrical City of Federal Way • dommunity&Econ.Dev.Services Permit #: 13-104961-00-EL 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: 253 Ph:(253)835-2607 Fax:(253)835-2609 i 8 -3050 Project Name: WYNSTONE EAST LOT 101 Project Address: 909 SW 339TH ST Parcel Number 957850 1010 Project Description: 200 A u/g New Residence Owner Applicant Contractor LENNAR NORTHWEST INC RON CARNINO PRECISION ELECTRIC ENT INC 12815 CANYON RD E SUITE F PRECISION ELECTRIC ENT INC PRECIEE984L5(6/25/14) PUYALLUP WA 98373 3205 GARFIELD ST 3205 GARFIELD ST ENUMCLAW WA 98022 ENUMCLAW WA 98022 Additional Permit Information Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional? No Electrical Fixtures New Service:Residential 1 PERMIT EXPIRES Sunday, May 4, 2014 Permit Issued on Tuesday, November 5, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington Nat11SfEleral Way. 9 Owner or agent Date: rFINIA LED + THIS CARD IS TO ON-SITE i ,- III CIT'OF Construction In ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 13-104961-00-EL Address: 909 SW 339TH ST Project: LENNAR NORTHWEST INC FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El LIFER Ground (4295) ElDitch cover(4030) 0 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By 3CDate (; I i 3By �1.�J Date. `e-2-N^1 `By Date 1 . Pool Bonding(4195) 0 Temporary Power(4275) •El Service(4235) Approved Approved Approved By Date By Date . 'By Dat\ 0 Feeders/Sub-panels(4045) �El Rough Electrical(4225) ' •0 �Ceiling Cover(4020) /il Approved Approved Approved By Date Ty---L, —...___>z_,._ Date — Z_. ( By Date 0 Final- trical(4055) Approved l Date S—.. SITE Rough Electrical ' 0 Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date