19-100639 Mechanical
City of Federal Way Permit #:19-100639-00-ME
Community Development Dept
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: CHUNG
Project Address: 29424 MILITARY RD S Parcel Number:042104 9082
Project Description: replacement of furnace,installation of gas pipe,AC&conversion of water heater to tankless
Owner Applicant Contractor
SOSUN CHUNG DAVID KALLANDERRANGER HEATING RANGER HEATING&COOLING LLC
29424 MILITARY RD S &COOLING (GENERAL 01)
FEDERAL WAY WA 98003 5013 PACIFIC HWY E SUITE 11 RANGEHC905OM(9/20/20)
TACOMA WA 98424 2010 48TH AVE E
• FIFE WA 98424
Additional Permit Information
Mechanical Work Valuation? 16000 Is this an Online or O.T.C.application? Yes
"t. ; Mechanic t' � t. :,. , i e• , r
Air Conditioners-Stand Alonc 1 Furnaces 1 Gas Pipe Outlets 3
Hot Water Tanks 1
PERMIT EXPIRES Wednesday,7 August,2019
Permit Issued on Friday,February 8,2019
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: c N L I N E Date:
�/L."
a . t
41& THIS CARD IS TO REMAIN ON-SITE
CITII Or Construction Inspection Record
Way INSPECTION REQUESTS:(253)835-3050
PERMIT#: 19 100639 00 Address: 29424 MILITARY RD S
Project: SOSUN CHUNG FEDERAL WAY WA 98003-7918
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) 0 Gas Piping(4125) 0 Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By p4/J Date .2 f 9 / By Date /`
0 Rough Electrical 0 Final Electrical 0 Right of Way
Approved Approved Approved
By Date By Date By Date