Loading...
19-100639 Mechanical City of Federal Way Permit #:19-100639-00-ME Community Development Dept 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: CHUNG Project Address: 29424 MILITARY RD S Parcel Number:042104 9082 Project Description: replacement of furnace,installation of gas pipe,AC&conversion of water heater to tankless Owner Applicant Contractor SOSUN CHUNG DAVID KALLANDERRANGER HEATING RANGER HEATING&COOLING LLC 29424 MILITARY RD S &COOLING (GENERAL 01) FEDERAL WAY WA 98003 5013 PACIFIC HWY E SUITE 11 RANGEHC905OM(9/20/20) TACOMA WA 98424 2010 48TH AVE E • FIFE WA 98424 Additional Permit Information Mechanical Work Valuation? 16000 Is this an Online or O.T.C.application? Yes "t. ; Mechanic t' � t. :,. , i e• , r Air Conditioners-Stand Alonc 1 Furnaces 1 Gas Pipe Outlets 3 Hot Water Tanks 1 PERMIT EXPIRES Wednesday,7 August,2019 Permit Issued on Friday,February 8,2019 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: c N L I N E Date: �/L." a . t 41& THIS CARD IS TO REMAIN ON-SITE CITII Or Construction Inspection Record Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 19 100639 00 Address: 29424 MILITARY RD S Project: SOSUN CHUNG FEDERAL WAY WA 98003-7918 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) 0 Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved By Date By p4/J Date .2 f 9 / By Date /` 0 Rough Electrical 0 Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date