Loading...
16-101298 • ! Mechanical Community&Federal ��W'� Permit #: 16-101298-00-M E 33325 8th Ave S Federal Way,WA 98003 Ph:(253)835-2607 Fax:(253)835-2609 FILE Inspection Request Line: (2 53)835-3050 Project Name: PELTON Project Address: 506 SW 352ND ST Parcel Number: 066230 0150 Project Description: Run gas line to range Owner Applicant Contractor KEVIN A GEORGE DWAYNE CURTISS ALL WAYS AIR CONTROL INC HELEN I PELTON ALL WAYS AIR CONTROL INC ALLWAAC074C3(5/6/16) 506 SW 352ND ST 1515 S CENTER ST 1515 S CENTER ST FEDERAL WAY WA 98023 TACOMA WA 98409 TACOMA WA 98409 Additional Permit Information Mechanical Work Valuation 500.00 Is this an Online or O.T.C.application? Yes Mechanical Fixtures Gas Pipe Outlets 1 PERMIT EXPIRES Monday, September 12, 2016 Permit Issued on Wednesday, March 16, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the of Federal Way. Owner or agent: ONLINE Date: �'►nand THIS CARD IS TO ON-SITE - , CITY OF Construction In ection Record Federal Way INSPECTION REQ TS: (253)835-3050 PERMIT#: 16-101298-00-ME Address: 506 SW 352ND ST Project: KEVIN A GEORGE FEDERAL WAY, WA 98023-8111 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) 0 Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date By /4J Date 311 )111. • ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date