Loading...
13-1024833 tity of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 1 4#uilding 4 Sin&Xamft y J� Permit #: 13 -102483 -00 -Sl± Inspection Request Line: (253) 835-3050 Project Name: WYNSTONE EAST LOT 99 Project Address: 919 SW 3391M ST Parcel Number: 957850 0990 Project Description: NEW - Construction of a 3,113 square foot, 2 -story, single-family residence with a basement, a 237 square foot covered entry, and a 349 square foot attached garage. Includes plumbing & mechanical. ***4 Bedrooms; $381,950 estimated selling price** Owner Agnlicant Contractor Lender LENNAR NORTHWEST INC LENNAR NORTHWEST INC LENNAR NORTHWEST INC OWNER IS LENDER 12815 CANYON RD E SUITE F 12815 CANYON RD E SUITE F LENNAN1893QG (11/7/13) R-3 PUYALLUP WA 98373 PUYALLUP WA 98373 12815 CANYON RD E SUITE F Residence (1 or 2 1 family) PUYALLUP WA 98373 Census Category: 101- New Single Family House Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load- oadFloor V - B FloorAreas . ft. 3,113 0 0 0 Additional Permit Information New / Additional Sq. Feet -1 st Floor....................1198 New / Additional Sq. Feet - 3rd Floor....................0 New / Additional Sq. Feet - Basement...................560 No Occupancy # I - Construction Type ........................Type V - B New / Additional Sq. Feet - Garage ....................... 349 Plumbing Work Valuation?....................................7500 New / Additional Sq. Feet - Other .........................237 R-3 New / Additional Sq. Feet - Total ..........................4333 es Zoning Designation................................................RM 3600 New / Additional Sq. Feet - 2nd Floor...................1355 Occupancy # 1 - Area (Sq. Feet).............................3113 BasicPlan?........................................................... No New / Additional Sq. Feet - Deck .......................... 0 Mechanical to be Included?....................................Yes Fireplace Inserts............................. 1 Occupancy # I -Class ............................................. R-3 Plumbing to be Included? ....................................... es Occupancy # 1 - Use ............................................... Residence (1 or 2 1 family) CONDITIONS: Mechanical Fixtures Ducting ........................................... 1 Fans................................................ 6 Fireplace Inserts............................. 1 Furnaces ......................................... 1 Gas Piping ...................................... 1 Gas Pipe Outlets............................. 4 Hot Water Tanks ........................... 1 Plumbing Fixtures Bathtubs ......................................... 2 Dishwashers................................... 1 Laundry Washer Outlets ............... 1 Lavatories....................................... 6 Showers ......................................... 3 Sinks............................................... 1 Water Closets ................................. 4 Hose Bibbs..................................... 2 CONDITIONS: PIT EXPIRES Monday, March 31,4 4 : < P it Issued on Wednesday, October 2, 93 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent Dater 2111 City of Federal Way Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff. Tenant Name: WYNSTONE EAST LOT 99 Permit #: 13 -102483 -00 -SF Address: 919 SW 339TH ST Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load- oadFloor FloorArea (sq. ft.) 3,113 0 0 1 0 Owner Name: LENNAR NORTHWEST INC Owner Address: 12815 CANYON RD E SUITE F PUYALLUP WA 98373 . Building Official S - MLI—I!:1 Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most sevedy affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner / occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which itis situated. Such compliance is the responsibility of the owner and / or occupant of the premises. THIS CARD IS TO `MAIN ON-SITE `CITU of �& • • Federal WayConstruction In ection Record INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 13 -102483 -00 -SF Address: 919 SW 339TH ST Project: LENNAR NORTHWEST INC FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. SWM Precon Site Mtg (4400) Approved ❑ Initial Erosion Control (4365) To be done prior to breaking ground Footings/Setback (4110) Approved to place concrete By Date By Dame " By Date Shear Walls (4245) Approved to install siding By C «.� Date _ a :) -1 Roof Sheathing (4220) Approved t install roofing � � By() tA.. X3 Date u Gas Piping (4125) Approved to release test By n *� Date '1 „< _t Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 Rough Plumbing (4230) Approved By Date Fire/Draft Stops (4095) Approved By Date 2,—S — Framing (4120) Approved to insulate By Date '� ��— i Foundation Wall (4115) Gypsum Wallboard Nailing (4130) Drainage/Downspout (4040) E] Plumbing Groundwork (4190) Approved to install mud & tape Approved to place concrete Approved V_ By Approved to backfill ByWVIj Date ?� 3 ( 11, f Approved to cover By Vi6 Date II loxvi I? By Date I2 l Date �2 ( � rl Slab/Concrete Floor (4255) Final - Plumbing (4075) 0 Final - Building (4050) Approved Underfloor Framing (4285) Floor Sheathing (4105) Approved Approved to place concrete Approved to sheath floor Approved to install flooring By " Date 0. (T i By By Date By Date Shear Walls (4245) Approved to install siding By C «.� Date _ a :) -1 Roof Sheathing (4220) Approved t install roofing � � By() tA.. X3 Date u Gas Piping (4125) Approved to release test By n *� Date '1 „< _t Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 Rough Plumbing (4230) Approved By Date Fire/Draft Stops (4095) Approved By Date 2,—S — Framing (4120) Approved to insulate By Date '� ��— i Insulation (4150) Gypsum Wallboard Nailing (4130) Final Erosion Control (4375) Approved to install wallboard Right of Way Approved to install mud & tape Date Approved V_ By V'A6 Date I ?, ByWVIj Date ?� 3 ( 11, f By Date rl Final - Mechanical (4065) Final - Plumbing (4075) 0 Final - Building (4050) Approved Approved Approved By WtS Date 5- J -J 114 By Date 5-1144 111 By Date 5 Rough Electrical Approved Final Electrical Approved 1:1Approved Right of Way By Date By Date By Date CITY O: ` Federal Way PERMIT NUMBER I —3 • REcEI VE ERMIT&PPLICATION RECEIVED N - 7 �o ?413 °►3 cl6 J� TARGET DATE CDS SITE ADDRESS SUITE/UNIT # 919 SW 339th St PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL # $ 171,215.00 RS7.2 _ _ _ _ 957850 _ 0990 TYPE OF PERMIT ❑ BUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION 04 NAME OF PROJECT IZ-,/ 1 29 Wynstone East Construct new SFR PROJECT DESCRIPTION Detailed description of work to be included on this permit only NAME PRIMARY PHONE PROPERTY OWNER Lennar NW Inc. 253-590-2205 MAILING ADDRESS E-MAIL 12815 Canyon Rd. E., Ste. F karen.hruza@lennar.com CITY STATE ZIP Puyallup WA 98373 NAME PHONE Lennar NW Inc. 253-590-2205 MAILING ADDRESS E-MAIL CONTRACTOR 12815 Canyon Rd. E., Ste. F karen.hruza@lennar.com CITY STATE ZIP FAX Puyallup WA 98373 253-446-6751 WA STATE CONTRACTOR'S LICENSE # EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE # LENNAN1893QG 11/ 07 13 20 -13 -100182 -00 -BL NAME PRIMARY PHONE Lennar NW Inc. 253-590-2205 APPLICANT MAILING ADDRESS 12815 Canyon Rd. E., Ste. F E-MAIL karen.hruza@lennar.com CITY STATE ZIP FAX Puyallup WA 98373 253-446-6751 NAME PRIMARY PHONE PROJECT CONTACT Karen Hruza 253-590-2205 MAILING ADDRESS 12815 Canyon Rd. E., Ste. F E-MAIL karen.hruza@lennar.com (The individual to receive and respond to all correspondence CITY Puyallup STATE WA ZIP 198373 FAX 253-446-6751 concerning this application) PROJECT FINANCING NAME N/A - Owner Financed ❑ OWNER -FINANCED Required value of $5, 000 or more MAILING ADDRESS, CITY, STATE, ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as apart of this application. l SIGNATURE: DATE PRINT NAME: Karen Hruza Bulletin #100 —January 1, 2013 Page 1 of 3 k:\Handouts\Pemiit Application i MECHANICAL PERMIT Indicate how many of each typt AIR HANDLING UNITS AIR CONDITIONER BOILERS COMPRESSORS DUCTING PLUMBING PERMIT BATHTUBS (or Tub/Shower combo( DISHWASHERS _ DRAINS _ DRINKING FOUNTAINS Z HOSE BIBBS 'fixture to be installed or relocated as 6 LAYS (Hand Smka) _ VALUE OF MECHANICAL WORK RAINWATER SYSTEMS _ 3 SHOWERS _ $ 4,800.00 'fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain_. SUMPS FANS GAS PIPE OUTLETS OTHER (Describe) 5028 FIREPLACE INSERTS HOODS (Commercial) FURNACES HOT WATER TANKS (Gaa) GARAGE RJ CARPORT ❑ None GAS LOG SETS REFRIGERATION SYST 4 GAS PIPING WOODSTOVES Additional Information EMSTUIa Area Totals _ 4333 4333 4333 OTAL Type Stories 'fixture to be installed or relocated as 6 LAYS (Hand Smka) _ SEWER PURVEYOR RAINWATER SYSTEMS _ 3 SHOWERS _ Lakehaven SINKS (Kitchen/Utihty) _ EXISTING/ PREVIOUS USE SUMPS GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS None Lakehaven Lakehaven $ None EXISTING/ PREVIOUS USE LOT SIZE (In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? None 5028 ❑ Yes ri( No ❑ Yes ii( No RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION (in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE . . ....... ...................... .......�..._ .. .. ...............-.. .. _ ....... FIRST FLOOR (or Mobile Home) None 1198 1198 4 •k (- a COVERED ENTRY None 237 237 b aw GARAGE RJ CARPORT ❑ None 349 349 r ,:5t'e' :.E."i..w F`�l?'.:Y• ..ry.� Occupancy Group(x) .� w"i!''L•ry• y - ..a'� ` Additional Information EMSTUIa Area Totals _ 4333 4333 4333 OTAL Type Stories ESTIMATED SELLING PRICE $ 3$1,950 # OF BEDROOMS 4 COMMERCIAL — NEW/ADDITION AREA DESCRIPTION Area Occupancy Group(s) Construction # of Additional Information in Square Feet Type Stories ADDITION COMMERCIAL — REMODEL/TENANT IMPROVEMENTS AREA DESCRIPTION Area Occupancy Group(x) Construction # of Additional Information in Square Feet Type Stories � �. _ * t%�:"-:�� r_" _ .-S�^i:"A">t'�'.:.'..7Nw�;`.•nr�".^ .4.. .:L pr _ �Fl�.. TENANT AREA ONLY 15% tma ,e t'"'rte:.'... Bulletin #100 - January 1, 2013 Page 2 of 3 k:\Handouts\Permit Application SjUL FM Department of Development and Env1llftMmJVC69 Building Services Division 900 Oakesdale Avenue Southwest Renton, Washington 98057-5212 JUN — 7 2013 206-296-6600 TTY 206-296-7217 Web date: 04/26/2007 VVI aiL1011110tas 4Vllr4C1t5, gall /-V0-,ZU0-00VU. Ne This certificate provides thg'M8MMERftaWiX King County Depaftment and the Department of Development and Environmental SerQM with information necessary to evaluate development proposals Do not write in this box i Number Name ✓ .®'Building Permit Wreliminary Plat or PUD ❑ Short Subdivision ❑ Rezone or other. J Applicant's name: d Proposed use: tn* .. W 5 +r 0cation (attach map and legal description if 012 it -4- 4 0 47, necessary): RPP!s ((04,, 9 06 MIT*] -11111111 Poll 11111 M, d 1. ❑ a. Wates can be provided by service connection only to an existing (size) water main that is feet from the site. OR ( b. Water service will require an improvement to the water system of 11(1) 4- D feet of water main to reach the site; and/or 4M (2) The construction of a distribution system on the site; and/or MU19T 2f A� fW a(3) Other(describe): �" $ y CuRIR, wr' OEVEttz eK FRaT�.4+d5t6w A6t ✓ 2. a.aR The water system is In conformance with a County approved water comprehensive plan, M41% f4GTiVA~t')04- ❑ b. The water system Improvement is not in conformance with a County approved water comprehensive plan and will require a water comprehensive plan amendment. (This may cause a delay in Issuance of a permit or approval.) 3. �i M a. The proposed project is within the corporate limits of the district, or has been granted Boundary Review Board approval for extension of service outside the district or city, or is within the County approved service area of a private water purveyor. OR ❑ b. Annexation or Boundary Review Board (BRB) approval will be necessary to provide service. ✓ 4. ® a. Water is or will be available at the ratg of flow and duration indicated below at no less than 20 psi measured at the nearest fire hydrant feet from the building/property (or as marked on the attached map): Rate offlow at Peak Demand. ❑ less than 500 gpm (approx. gpm) Q 500 to 999 gpm ❑ 1000 gpm or more ❑ flow test Of gpm ❑ calculation of gpm Duration. ❑ less than 1 hour ❑ 1 hour to 2 hours #j 2 hours or more Other OR (Note: Commercial building permits which include multifamily astructures require flow test or calculation.) ✓Elb. Water system is not capable of providing fire flow. 5. ® a. ' Water system has certificates of water rights or water right claims sufficient to provide service. OR ❑ b. Water system does not currently have necessary water rights or water right claims.. Comments/conditions: WAT50-. SlAutelg ComtjGcnorva ApIpLAC — -�tiR I certify that the above water purveyor information is true. This certification shall be valid for one, year from date of signature. LAKEHAVEN UTILITY DISTRICT(f,,.L �C-L66 jJ Agency name 111.11, SIIgnatory.na e Title Sign tA, '7//511Z Date In V8 . Pressure Zone; g Elevation of Property 4110 Z - Min. 5o 106 Lowest p ' fit' Max_ Pressure psi The District, at its sate discretion, reserves the right to delay or derby water service based upon capacity limitations In District and Other Purveyor facilities. Water availability form Rev. 05-19-2003 Page 1 of 1 . S Page 2 of 2 a 2006. Lakehaven Utility District neither warrants nor guarantees the accuracy of any facrtrty rntonnauon mown. r-acnrty locations and conditions are subject to field verification. http://columbia/lion/map.aspx 7/13/2012 IP ID I 1�' 4w- oo MIM a 2006. Lakehaven Utility District neither warrants nor guarantees the accuracy of any facrtrty rntonnauon mown. r-acnrty locations and conditions are subject to field verification. http://columbia/lion/map.aspx 7/13/2012 s LAKEHArV'EN UTILITY DISTRICT Hydraulic Model Fire Flow Estimate Request/Reporting Form Requested By: KRB Date. 10/19/1999 Location to beModcicd: SW WH ST & 12 AVE SW (approx.) Lakchaven'/+ Section Grid: G_11 Intersection: SW 3447n / 12TH SW Add, Description: See attached map Pressuro zo„c 538 Results By: JCB (form update 3/17/11 BTA) Date: 10/22/1999 Model Run No.: Master Water System Model 2007.net FF 9133 Condition Pressure (psi) Flow (gpm) Static 46 0 Fire Flow 20 3000 NOTES: Lakehaven's adopted level of service goals for fire flow rates are 1000 gprn within single family residential areas (including duplexes) and 2500 gpm for multi -family, commercial, industrial areas. Model results depict the theoretical performance of the water system under high demand conditions and arc not guaranteed to represent actual system performance. A design professional should be consulted for site specific design purposes. The calculated fire flow capacity in the above table is based on a currently available residual system pressure of 20 psi at the location modeled. The model indicates that Lakehaven's standard maximum allowable velocity of 10 Ws is exceeded at a fire flow rate above 2500 gpm. Fire flow capacities greater than 2500 gpm. may be accommodated through water system improvements. Form Rev. 5/30/08 sa: 131.�� ®, v L+7 m eIN --- Fc��ri• rs 4th >3 C7 }> j ti� )e (i 31n u y a / R 4 ,} 1- 11 dR Z 3 ,b S 1Try PL i YS Sa { — X1315 S 48 s> la i w sl 3�, is .o it 5G s "'0 s3 __TIT t hr� Ci• i Yr2' �S:y k�`-- c�w 36 S ILRWO D tidR 5WF- 7TH SI d la' ). C�� •! , Pj FOREST fog 1 u EL MJ.'sNTARYw :1 Y2 S gFL —j– S 1} 1{lpx• j a __ aI . a __—1 �` si ss 5. � -+. :Ir�a--n7•s � +.r.�45 5x. - q{� 4n,`) 13 � 3! Sn It �' •a » IV Ii fa 1) d 37 31 •f 2 .f ) fi-W n° N ) _ L�5/ IR Y �1Rl J.1 y Diw •f •) �1 '•� if ro `-J <1 i1 ai Sf 5l i •ems %l LAKEHAVEN UTILITY DISTRICT Hydraulic Model Fare Flow Estimate Request/Reporting Form Requested By: Kathy Brown Date: 03/18/98 Hydrant Location: See attached site plan 1/4 section: G_11 Intersection: 10th Ave SW & SW Campus Drive Add. Description: h6bulirb Liz; John Bowman 03/20/98 95LUDSFF.INP FF#61 Conditioff Pressure (psi) Flow (gpm) Static 91 0 Fire Flow 20 6300 NOTE: The fire flow analysis was performed at the 10" pipe crossing near 10th Ave SW and Campus Drive. On-site fire flow estimates would have to be determined during design of the water system improvements. This fire flow rate will cause velocities in excess of 10 f/s within the water distribution system and pressures in some areas to drop below 20 psi. A fire flow rate less than 3200 gpm will maintain flow velocities below 10 f/s and system pressures above 20 psi. There is no guarantee that the Hydraulic Model results will represent actual system performance. Model results depict the theoretical performance of the system under high demand conditions. Field measurements should always be obtained for design purposes. 27 63 ' � 4• j ,te.�d t��'777 �a x�J� i?5.,4 es •,L 2 49 50 1 tr_ 52 YDO \ 61Di 6 _ i 26 j 4'ro' 4 +z TOO 1 6) G/ 'rJ' Jrr J'' I r'r JJ JJ J I I' r I' JJ / JJ JJ • C/1 S4 '✓57 rE0 G4. ss H a 60 D 24 )-c .y 16 62 J, I \\'4 ✓JJ 23 7\' 63 26 22 4 54 53 A 21 7 27 6 4 ��1r�'r J 20 9 01 26 c, I / l yy rJ VV1 J 'rJ / 17 � 4 16 E t5 S r 312 FACILITY MAP 29 30 41 r•S• so .aa~cr 45 �� n�42 J 31 cly 41 d� 10• 49 47 46 `` 1' 32 �QV 40 39 dd t J{ 33 47 4 N J ° w P 4E � sc-E M FEET 0 _i00_.. G-1 UTILITY DISTRICT a • qq FILE LAKEHAVEN UTILITY DISTRICT 3162715` Ave South • P.O. Box 4249 - Federal Way, Washington 98063-4249 �Win' Federal Way: 253-941-1516 • Tacoma: 253-927-2922 T u+1TY DI5TRi www.lakehaven.org November 7, 2012 Ann Dower Community Development Department City of Federal Way P.O. Box 9718 Federal Way, WA 98063-9718 RE: Final Plat Approval Status Wynstone East Project No. 6305037 Mr. Dower: RECEIVED JUN '70 2013 CITY OF FEDERAL WAY CDS This letter serves as a status report to advise the Federal Way City Council on final plat approval for the referenced project. The water and sewer systems for this project are substantially complete, and service connections can be fully processed and activated under standard Lakehaven procedures. Terms of the referenced agreement with Lakehaven Utility District provide for final completion of construction of the water and sewer facilities for the project. Please do not hesitate to contact me, if you have any questions. I may be reached by phone at (253) 946-5406, by electronic mail at )Jensen@Lakehaven.org, or by fax at (253) 529-4081. Sincerely, /nA.' J.� /Engine rig g Technician II c: Pete Lymberis- Quadrant Kris Nelson - Barghausen Consulting Engineers ec: DevEngr Mgr Leonard D. Englund Charles I. Gibson Timothy A. McClain Donald L.P. Miller Ronald E. Nowicki Commissioner Commissioner Commissioner Commissioner Commissioner L 0660-09SL96 130UVd °-66J,01=3NO1SNAM N f G a -C NV Id 311S IMI1N3aIS38 :e,3l1 Q w•` o M M Z 0;