12-102233 •
• , ' • Electrical
City of FeWay Permit #: 12-102233-00-EL
Community&Econ.n.D ev.Services
33325 8th Ave 5S
FILE
Federal Way,WA 98003 Inspection Request Line:
Ph:(253)835-2607 Fax:(253)835-2609 pe q (253)835-3050
Project Name: SCHAFF
Project Address: 1826 SW 349TH, Pl- Parcel Number: 542350 0410
Project Description: Wiring of subfeeder from existing service to manufactured home
Owner Applicant Contractor
KENNETH A SCHAFF STEVE COUCH STMA ELECTRIC
24311 17TH AVE S STMA ELECTRICAL SERVICES STMAES*978N6 (9/1/13)
DES MOINES WA 98198-8619 303 SE CREEK ST PO BOX 3091
YELM WA 98597 YELM WA 98597
•
Additional Permit Information
Is Use Educational or Institutional? No Service greater than 999 Amps? No
Electrical Fixtures
Service or Feeder-Manu./Mobile 1
PERMIT EXPIRES Sunday, May 18, 2014
Permit Issued on Friday, May 18, 2012
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: ONLINE Date:
4411121,
,400 • THIS CARD IS TO MAIN ON-SITE ,
CITY OF Construction In ection Record
Federal Way INSPECTION REQ TS: (253)835-3050
PERMIT#: 12-102233-00-EL Address: 1826 SW 349TH ST
Project: KENNETH A SCHAFF FEDERAL WAY, WA 98023-6904
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
O UFER Ground(4295) ❑ Ditch cover(4030) ❑ Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
El Pool Bonding(4195) .0 Temporary Power(4275) ..0 Service(4235) '
Approved Approved Approved
By Date By Date By Date
Qom,._ 4 —‘.(,---1,-1....
O Feeders/Sub-panels(4045) 0 Rough Electrical(4225) ❑ Ceiling Cover(4020)
Approved Approved Approved
By Date By Date By Date
❑ Final-Electrical(4055)
Approved
By Q W,.— Date ks_ Z
k-�1
❑ Rough Electrical Et Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date