19-102691 Mechanical
City of Federal Way Permit #:19-102691-00-ME
Community Development Dept FILE
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph-(253)835-2607 Fax(253)835-2609
Project Name: CHOI
Project Address: 32550 7TH PL S Parcel Number:326070 1130
Project Description: Replace existing gas furnace
•
Owner Applicant Contractor
BYEONG CHOI JAIMIE HOWBRENNAN HEATING&A/C BRENNAN HEATING&A/C LLC
32550 7TH PL S 4601 S 134TH PL (GENERAL 01)
FEDERAL WAY WA 98003 SEATTLE WA 98168 BRENNHA971R9(12/29/19)
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Mechanical Work Valuation? 2799 Is this an Online or O.T.C.application? Yes
• '�� f•. .. .'_i..:3'" .a .. S�� ��" �' N"�'•?'z - 3
Furnaces 1
PERMIT EXPIRES Monday,2 December,2019
Permit Issued on Wednesday,June 5,2019
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
i n a e i Federal Way.
Owner or agent: Date:
1
AA/ /
4A THIS CARD IS TO REMAIN ON-SITE
Federal Wa Construction Inspection Record
y INSPECTION REQUESTS:(253)835-3050
PERMIT#: 19 102691 00 Address: 32550 7TH PL S
Project: BYEONG CHOI FEDERAL WAY WA 98003-5913
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Mechanical Rough-in(4165) El Gas Piping(4125) 0 Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date B3 .9 Date /-
•
0 Rough Electrical 0 Final Electrical 0 Right of Way
Approved Approved
Approved
By Date By Date
By Date