19-100010 U'
-
Electrical
City of Federal Way Permit #:19-100010-00-EL
Community Development Dept
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609 tl " 110
Project Name: JOLLEY
Project Address: 823 SW 313TH CT Parcel Number: 555990 0160
Project Description: Installation of 5kw solar PV system.
•
Owner Applicant Contractor
KRIS&JENNIFER JOLLEY KRIS&JENNIFER JOLLEY OWNER IS CONTRACTOR
823 SW 313TH CT 823 SW 313TH CT
FEDERAL WAY WA 98023 FEDERAL WAY WA 98023
Additional Permit Information
Is this an Online or O.T.C.application9 No
<x - ' '„• 1 lectrielti Fi)ixtura ;, .
Circuits-Residential 1
PERMIT EXPIRES Saturday, 15 February,2020
Permit Issued on Friday,February 15,2019
I hereby certify that the abtve information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: , Date: -/51-1 6
/(‘ ) pc
r, ti
4sA, THIS CARD IS TO REMAIN ON-SITE
�^��!'dI THIS
Inspection Record
F@INSPECTION REQUESTS:(253)835-3050
PERMIT#: 19 100010 00 Address: 823 SW 313TH CT
Project: KRIS&JENNIFER JOLLEY FEDERAL WAY WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD.'Inspections aro listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about my of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
UFER Ground(4295) 0 Ditch cover(4030) El Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
0 Service(4235) [B Feeders/Sub-panels(4045) ED Rough Electrical(4225)
Approved Approved Approved
By Date By Date By Date
Q Ceiling Cover(4020) ® Final-Electrical(4055)
Approved pproved
By Date By Date? 7'"
•
Rough Electrical 0 Final Electrical 0 Right of Way
Approved Approved Approved
r By . Date By Date By Date
V •
4 '�,'•.1 14\:
.�
7, • • . •I i
.►
k. 1
m
...' 1" 4N„,, ., , ,Q,1
,,, „
...... , . `‘-; '
cN.
ii. 41. ‘,‘ 'k .1 , ts [>,
1
f 2
7
RECEIVED
CITY OF ___4_,.. ELECTRICAL
Federal Way JAN 0 2 2019 PERMIT APPLICATION
CITY OF FEDERAL WAY
COMMUNITY DEVELOPMENT /l
PERMIT NUMBER / - / O V O ( O
f / SUITE/UNIT/SPACE#
SITE ADDRESS: 313` 7— `c.,»f li/y 7�y 9Us'-3
PROJECT VALUATION ASSESSOR'S TAX/PARCEL# CURRENT/PROPOSED USE
$ /e.'(V . 1:7 ? 1 C - a f c
PROJECT NAME
(Tenant or Homeowner Last Name) I)'1C'_r_
7�slv,eA- 5 ,mow So% pi/ srf44,1 tyi
PROJECT DESCRIPTION LL
Detailed description of work to S i7v 1 kk 4-1t1 ?OVA
A
be included on this permit only
NAME PRIMARY PRONEE
PROPERTY OWNER !-'p iS *:..Seri I iEa (4&i) 'f2.3 -Sl,)6,
MAILING
g.23 ADDRESS SLS 3/3d-cr 4,sk (4). V,1/1t141'\
CITY STATE ZIP FAX
-_ �1 �(Ydr bJ'��� 11; CAW3 ( ) -
NAME - PRIMARY PHONE
->AVit( 4 5 a464/-( ( )
MAILING ADDRESS E-MAIL
ELECTRICAL
CONTRACTOR crrY STATE ZIP FAX
( ) -
WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE#
/ /
NAME PRIMARY PRONE
APPLICANT r��1 Of 440 1.( ( ) -
MAIIdNG ADDRESS E-MAIL
CITY STATE ZIP FAX
( ) -
NAME PRIMARY PHONE
PROJECT CONTACT l J 0 (v2 6& ) LW-SSC
I certify under penalty of perjury that I am the property owner or authorised agent of the property owner.I certify that to the best of
my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with all
applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in
the investigation and defense of such claim),which may be made by any person,including the undersigned,and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied to the city as a part of this application. /
SIGNATURE: � e �/ DATE �'.%' / rr / I
PRINT NAME: / ./f '1'iidZLy
//
PERMIT CENTER 4 33325 8th Avenue South+ Federal Way,WA 98003-6325
253-835-2607+FAX 253-835-2609 +permitcentena citvoffederalway.com
Bulletin#160—April 14,2016 Page 1 of 1 k:\Handouts\Electrical Permit Application
HtUtIVtu
A - . if- ZOO opo
JAN 022019
CITY OF FEDERAL WAY
COMMUNITY DEVELOPMENT'
CITY OF 1 Allik
Property Owner
Federal Way Electrical Work Permit Application
- . Applying For:Your Electrical Permit -- .. Y•
In Washington, only licensed electrical contractors may perform electrical work. Property owners
may apply for an exemption from these requirements by completing this application and signing
the affidavit below before beginning electrical work.
.,,7-7,k ' .,.. ..... .. -... . -1-7.•:7"'.''''.'71:'''.7"''':"'' .. f,..7:
E Affidavit - ,>,,
As authorized under RCW 19.28.261, 1, ik)5 iI� hereby apply!
(Printed name of property fwner,renter,or lessee)
for an exemption from the electrical licensing and certification requirements of RCW 19.28 by I •
submission of this affidavit.
Which statement describes you? (Mark only one.If none apply,you may not take out this permit.)
.----6
own this property.
i Your name or your company's name must be shown on the deed to the property.Real estate agents'property
management companies, relatives, etc. cannot purchase permits for the property owner.
I ❑ I rent or lease this property. £
{ We need a copy of your rental agreement showing you have permission to perform electrical work.
a ❑ I am an officer for a 501(c)(3)nonprofit corporation,or a nonprofit religious organization.
The total market value of electrical work must be$30,000 or less and all electrical work must be done by a
non-compensated appropriately certified electrician.
Select your property type(Mark only one.If none apply,you may not take out this permit.)
pfr—New single family residence that is not intended for rent, sale, or lease,where I will be living for
at least 24 months after completing the electrical work. I will be personally doing the electrical
work.
.
❑ New 2,3,or 4 unit residential building, owned by me,that is intended for rent, sale, or lease. I i
will be living in one of the units for at least 24 months after completing electrical work. I,
personally, and/or a regularly employed employee(s),will be doing the electricalwork.
❑ New place of business,farm,or other property: Any new structure that is not intended for rent,
d -,or lease. I,personally,and/or a regularly employed employee(s),will be doing the electrical work.
r► isting residential property,place of business,or farm.I,personally,and/or a regularly
employed employee(s),will be doing the electrical work.
DEPARTMENT OF COMMUNITY DEVELOPMENT/33325 8TH AVENUE SOUTH/FEDERAL WAY,WA 98003-6325
253-835-2607 li,.www.cityofiederalway.com zs permitcenter@cityoffederalway.com
Bulletin#080—June 6,2018 Page 1 of 2 k:\Handouts\Property Owner Electrical Work Application
• • i
0 501(c)(3)or nonprofit religious organization owned property:The total market value of the
electrical work must be$30,000 or less,and all electrical work will be performed by appropriately
certified electricians,or certified and properly supervised trainees, who are volunteering and not
being compensated for the electrical work per RCW 19.28.091(7).
Your signature is required below:
I believe I should be exempt from the requirements to obtain an electrical license,or use a certified
. electrician,as provided under RCW 19.28.261.
By signing below,I certify the information I am providing on this affidavit is true and accurate. I
" understand that if I make false statements or misrepresentations, I may be assessed penalties.
KRIS
Printed Name 'f Property Owner,Renter,or Lessee ':nature
k.2-/
Date
Property Owner and inspection SiteInformation.
SOI K-i S
1
Property wner's Name(Last,First)or Company Name
X23 Sw 313j11 c � J 10a.g la ft 0923
Mailing Address Unit/Apt.# City State Zip
‘,2o6- 1-423-5/ft
Daytime Phone Email Address
Inspection Site Address(if different) Unit/Apt.# City State Zip
ps6
County Electrical Power Company/Serving Utility
Description of work being done(Example:adding outlets in the kitchen,second floor break area,etc.)
7/JSq s eliv 5014E-i'' 19// -Sp4-0
DEPARTMENT OF COMMUNITY DEVELOPMENT/33325 8TH AVENUE SOUTH/FEDERAL WAY,WA 98003-6325
253-835-2607 zs www.cityoffederalway.com permitcenterRcityoffederalway.corn
Bulletin#080—June 6,2018 Page 2 of 2 k:\Handouts\Property Owner Electrical Work Application