15-106459 Electrical
City of ay
Comm unity a Econ.nDev.Services L Permit #: 15-106459-00-EL
33325 8th Ave
S
Federal Way,WA 98003
Ph:(253)835-2607 Fax: 2(3835-2609 Inspection Request Line: (253)835-3050
Project Name: CHAN
Project Address: 410 SW 345TH PL Parcel Number: 132170 0090
Project Description: Change out existing gas furnace,Like for Like and install a circuit for a 4-ton a/c
Owner Applicant Contractor
JAMES K CHAN JAIMIE HOW BRENNAN HEATING&A/C LLC
DIANA I CHAN BRENNAN HEATING&A/C (ELECTRICAL 01)
410 SW 345TH PL 4601 S 134TH PL BRENNHA962DU(3/31/16)
FEDERAL WAY WA 98023-8356 SEATTLE WA 98168 4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Electrical Work Valuation? 300 Is this an Online or O.T.C.application? Yes
Is Use Educational or Institutional9 No
Electrical Fixtures
Circuits-Residential 2 Thermostat. 1
PERMIT EXPIRES Monday, June 20, 2016
Permit Issued on Wednesday, December 23, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: ONLINE Date:
ED
IN
Xt
• 4-THIS CARD IS TO IN ON-SITE .. , . -
c,� Construction In ection Record
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 15-106459-00-EL Address: 410 SW 345TH PL
Project: JAMES K CHAN FEDERAL WAY, WA 98023-8356
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD, Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El UFER Ground (4295) ❑ Ditch cover(4030) 0 Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
.
o Pool Bonding(4195) ❑ Temporary Power(4275) El Service(4235)
Approved Approved Approved
By Date By Date By Date
4 .
0 Feeders/Sub-panels(4045) El Rough Electrical(4225) El Ceiling Cover(4020)
Approved Approved Approved
By Date By Date By Date
.
El Final-Electrical(4055)
Approved
By (G Date ( -L I1i
El Rough Electrical Final Electrical Right of Way
Approved Approved0 Approved
By Date By - Date By Date