Project Name: HAMILTON
Project Address: 1824 SW 345TH PL Parcel Number: 189545 0150
Project Description:.REP-Repair damage to wall from vehicle strike.
Owner Applicant Contractor Lender
•
CARROL&WEI HAMILTON P W C CONSTRUCTION P W C CONSTRUCTION
1845 SW 345TH PL 20250 144TH AVE NE SUITE 310 PWCCOC*934JP(4/17/13)
FEDERAL WAY WA 98023 WOODINVILLE WA 98072 20250 144TH AVE NE SUITE 310
WOODINVILLE WA 98072
Census Category: 434-Residential alt/add-no change in number of units
Includes: #1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load
Floor Area(sq.ft.) 0 0 0 0
Additional Permit Information
New/Additional Sq.Feet-3rd Floor 0 New/Additional Sq.Feet-Basement 0
Mechanical to be Included? No Plumbing to be Included? No
No Fixtures Associated With This Permit ii
CONDITIONS:
NOTE: Work to be completed in accordance with Engineer's recommendations.
JL ) 4 �d
PERMIT EXPIRES Monday, September 10, 2012
Permit Issued on Wednesday, March 14, 2012
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: Y /�
CA/0 Z.z Date: 3-14 - Ie�
IAA c C (�,1ill eStiAn. ] o'v1
THIS CARD IS TO MAIN ON-SITE
CITY.of40A Construction In ection Record •'
Federal Way INSPECTION REQ TS: (253)835-3050
PERMIT#: 12-101185-00-SF Address: 1824 SW 345TH PL
Project: CARROL &WEI HAMILTON FEDERAL WAY, WA 98023-7062
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
O SWM Precon Site Mtg(4400) 0 Initial Erosion Control(4365) ❑ Underfloor Framing(4285)
Approved To be done prior to breaking ground Approved to sheath floor
By Date By Date By Date
O Floor Sheathing(4105) 0 Shear Walls(4245) 0 Roof Sheathing(4220)
Approved to install flooring Approved to install siding Approved to install roofing
By Date By Date By Date
O Fire/Draft Stops(4095) 0 Interim Erosion Control(4370) 1
Approved Approved Prior to scheduling a Framing inspection;
Electrical,Plumbing&Mechanical Rough-in and
Fire/Draft Stop inspections must be signed-off and
By Date By Date approved. IBC 109.3.4
1
O Framing(4120) 0 Insulation(4150) ❑Gypsum Wallboard Nailing(4130)
Approved to insulate Approved to install wallboard Approved to install mud&tape
By nvs. Date `�� U)_ By �A._ Dater3.)-----l.Z By� ^ Date 3 _�3 L Z
El Final Erosion Control(4375) ❑ Final-Building(4050)
Approved Approved
By Date By ( •, Date xi
0 Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date
•
FILE
•
,fg7IG4rt
rT `F
Sound
February 23,2012
Ms. Holly McLallin
PWC Construction
20250 144th Ave.NE, Suite 310
Woodinville, WA 98072
holly.mclallin@pwcconstruction.com
\oSEPI411tces,
'L
RE: Investigative Report p' -4
) 11% ,
Insured: Mr. Hamilton
=a w�
Loss Address: 1824 SW 345th Place � \��
Federal Way,WA 98032 s670Aukt.GN�'.
Your Job#: 5090 'n
Dear Ms. McLallin,
In response to your request, Sound Investigative Engineers conducted a limited structural
evaluation of reported fractures to the concrete foundation wall at the above referenced address.
It had been reported at that a SUV type motor vehicle struck the side of the residence resulting in
structural and non-structural damage to the exterior wall and supporting foundation wall.
The purpose of the structural evaluation was to determine if the reported fractures were caused
by the vehicle strike and a recommendation for repair, if necessary. The site inspection was
conducted by the undersigned Tuesday, February 22,2012.
During the site inspection, the following pertinent observations and findings were made;
1. The single family residence is two stories in height and constructed with an attached
garage and is located on a corner lot.
RECEIVED
SOUND INVESTIGATIVE ENGINEERS, LLC
MAR 1 4 2012
1802 "A"Street SE,#223
Auburn, WA 98002 CITY OF FEDERAL WAY
(206) 621-1686 CDS
• •
Engineering Report
Hamilton Residence
February 23,2012
Page 2 of 6
2. The structure is 40 ft in width and 54 ft in length and constructed with its long axis
orientated in a north/south direction.
3. King County records reveal the building was constructed in 2004 and was in apparent
compliance with the 2003 International Residential Code as amended by King County
and WAC 51-20 at the time of its construction.
4. The roof is supported by the east and west exterior walls. The 1st story floor is supported
by 2x10 joists orientated in a north/south direction. These floor joists are supported by
post and beam construction located in the under floor crawl space.
5. Traveling in a northwesterly direction,the vehicle's left front reportedly struck the wood
framing members of east exterior wall. The vehicle struck the 2x4 stud pony wall located
between the top of the concrete foundation and the 1st story floor resulting in damage to
2-3 studs. The concrete foundation wall at the area of the vehicle strike is 8"in width and
approximately 2'in height. A 3x4 pressure treated mud sill is constructed along the top of
the concrete foundation wall.
6. A 4x10 floor support beam constructed within the underfloor crawlspace is located in the
vicinity of the vehicle strike. The floor support beam is constructed in an east/west
direction and the bottom of the beams east end abuts the top of the 3x4 pressure treated
mud sill. Examination of the 3x4 pressure treated mud sill and east end of the floor
support beam revealed no evidence of crushing indicating no movement or damage to the
floor support beam or 3x4 pressure treated mud sill.
7. An approximate 12" long vertical fracture was observed in the 8"concrete foundation
wall in the area of the vehicle strike. Two additional and similar vertical fractures were
observed north and south of the vertical fracture located at the area of vehicle strike.
Similar size fractures were observed to the concrete foundation wall located on the west
side of the structure. All observed vertical fractures in the concrete foundation walls
exhibited little to no debris within the fracture suggesting a recent occurrence.
8. The vertical fractures are generally wider,approximately 3/32", at the top of the
foundation wall and diminish to 0" at approximately 12".
9. A 1" diameter threaded rod,connected to an assumed hold down anchor located within
the exterior wall above the 1st story floor is constructed through the 3x4 pressure treated
mud sill and into the 8"concrete foundation wall at the vicinity of the vertical fracture
and vehicle impact site. There is no evidence of damage or movement of the threaded
rod.
SOUND INVESTIGATIVE ENGINEERS, LLC
1802 "A"Street SE,#223
Auburn,WA 98002
(206)621-1686
• •
Engineering Report
Hamilton Residence
February 23,2012
Page 3 of 6
10.Examination of the interior side of the east exterior wall,in the vicinity of the vehicle
strike, revealed inward movement of the wall located proximal to the bottom plate. An
interior wall,orientated in an east/west direction,that abuts the east exterior wall and at
the location of the vehicle strike exhibited no movement or damage.
11. Examination of the hardwood floor and interior walls adjoining the floor revealed no
movement or damage.
12.Mr.Hamilton reported that the home inspector who performed the real estate pre-sale
inspection did not include any reference of the vertical fractures in his report. Mr.
Hamilton further reported that he recently pressure washed the foundation wall and did
not recall observing the vertical fractures prior to the vehicle strike.
Conclusion:
1. In our opinion,the reported and observed fractures to the top portion of the 8"wide
concrete foundation wall are due to normal shrinkage of the concrete following
construction. The vehicle impact may have accelerated or exacerbated fractures that
existed prior to the vehicle strike.
2. In our opinion,observed fractures have not lessened the ability of the concrete foundation
to continue resisting vertical and lateral forces for which it was designed.
Recommendations:
1. We recommend that the fractures be filled with a quality cementitious or epoxy material
that will prevent intrusion of rain or storm water during periods of freeze temperatures
which may expand resulting in additional stress type damage.
End of Report
Please do not hesitate to contact me if you have any questions regarding this information or if we
can be of further service.
incerely,
Jack i gold
cc: Chuck Williams,P.E, S.E [20122237r.001]
SOUND INVESTIGATIVE ENGINEERS, LLC
1802 "A"Street SE,#223
Auburn,WA 98002
(206)621-1686
• • , ,
Engineering Report
Hamilton Residence
February 23,2012
Page 4 of 6
¢_ 1''
f' C
$ -- .., ii g I s. \fir ; itteT� — .:..
A
Figure 1 Vehicle travel in a northwesterly direction prior to impact
. ‘wontk„ - \ , i,
,, \ f i i
_, ,
'.4..„-- .„--- __- - ._ ,_ . it
- it � „mom.. k !
S 4
t
. �.+s na yy�; 411f r i '''.1•10-,
., s3k -. .+:Rx. ,.�. _ GY._. . .,... .. ...5'f,T ^4gi'�_
d.W4
Figure 2 East elevation of the subject residence and area of vehicle impact
SOUND INVESTIGATIVE ENGINEERS, LLC
1802 "A" Street SE, #223
Auburn, WA 98002
(206) 621-1686
• • ,
Engineering Report
Hamilton Residence
February 23, 2012
Page 5 of 6
•
ilt,
,tet=.,
.atF
••alr— C --- bbl.
...... ` ."
.,..,°' +ate h .,,„..-v_
�
. te`"- - `f ':.:. - - �-
Figure 3 Vehicle impact site damaging wood wall framing members above the concrete
foundation and below the floor
r
•
i — --
.
*ear' , fat r c
c r 11 .< ,s.. s ..s' 4 '
Figure 4 Arrow noting location of vertical fracture in the concrete foundation wall at the
site of vehicle strike
SOUND INVESTIGATIVE ENGINEERS, LLC
1802 "A" Street SE,#223
Auburn, WA 98002
(206) 621-1686
. , • •
Engineering Report •
Hamilton Residence
February 23, 2012
Page 6of6
Of
0
Figure 5 Fracture in the concrete foundation wall located at the site if vehicle impact
— 1.
' s
�______, 1 - ,
,, ik k,
g
•x
4.
k - -. •'_
- . • • .."',y 11 . 1 J. .,�,i, �,. I.:.. i.,. - .' ...
Figure 6 Vertical Fractures also observed along the west concrete foundation •wall
SOUND INVESTIGATIVE ENGINEERS, LLC
1802 "A" Street SE, #223
Auburn, WA 98002
(206) 621-1686
ecip
co-NI -
.6_-_-
,4 (o�� / D / I £
CITY OF - A M PERMIT SF —F CO ME PL DE EN FPS
Federal Way t\r., R
of epe 'LICATION (5a, 1)-eco (c0 0
COMMUNITY DEVELOPMENT SERVICES
253-835-2607•FAX 253-835-2
www.O9(01(ederalwau.co CO VO 4'g-
SITE ADDRESS SUITE/UNIT#
ISLE 5W 345t'' Plac-e_ edec o v (K \ q8o)-3 N/A
PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL#
$y q 2✓1 •— - ,c--- O l S O
TYPE OF PERMIT BUILDING ❑ PLUMBING ❑ MECHANICAL
❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION
NAME OF PROJECT
(Tenant Name/Homeowner Last Name)
�Qnp,,+ I
PROJECT DESCRIPTION - V�az' 1�` fry- (' c`�-Q'-- �h^� ` " ID hu \Q •
Detailed description of work to 6 d- ons •.(1C. ukckkC) -S .,m, (- 1 �S� Ut I ad+nl
be included on this permit only �1 el 't( ' 1 • JJ
NAME PRIMARY PHONE
PROPERTY OWNER Ca✓�Q Ra f `N ` z.53 9-32.---ci le+
MAILINGIIADDRESS E-MAIL
( 2z4 OW 345' P kc- . - l , G��tTrlcrkTNAa
CITY P
- ' 're-)COLI, W0‘44, 1N� I �g80' -.3
tPWG COO NYIA ,+icn
PHONE
PW
MAILINGADDRESS
T" `6-ADDRESS Are_ �1 C,3E-MAIL`S,
CONTRACTOR 1414 ' M-v 3,O
CITY , STATE ZIP FAX
V'Joockk( Ok k. W(+ Qe)0--- z-Fa5-.)50 -5045
WA STATE CONTRACTOR'S LICENSE 8 EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE 8
pwccoc-*g54-1/457 04 / 11-- / 13 ;36 -10-. 013'\\-O0-g1_.
NAME M \ly', 1`1\Gt_ 1lin TV CronS�, ' C 'Ori fay-. J--5y -1503
APPLICANT MAILING ADDRESS E-MAIL
50,-) Q, 6 .,5 CCX1` raLtDr- ho1\u0.. y c.con Structicel
CITY STATE ZIP FAX"I9'5-as o—54145 cry
PROJECT CONTACT NAME IAi PHONE G,�
(The individual to receive and I"1J� ‘‘.1"44"4(1� - 1"C' Can 8� �� dig-5-‘9-to-55 �
respond to all correspondence MAILING ADDRESS E-MAIL
concerning this application) X - 0.3 CCi 1 I M(.1-DC
CITY STATE ZIP FAX
ALTERNATE CONTACT NAME: PHONE E-MAIL
PROJECT FINANCING NAME I
OWNER-FINANCED
Required value of$5,000 or more
(RCW 19.27.095) MAILING ADDRESS,CITY,STATE,ZIP PHONE
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best
of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in
the investigation and defense of such claim),which may be made by any person, including the undersigned,and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied to the city(ass a part of this application.
G.12-C4
SIGNATURE: �y, j�H l l , 1 / }�� , �.{ DATE 28 1
PRINT NAME: tit U I1 \ 1 �� bltn PNV Cot)1 I V c oro
Bulletin#100—January 1,2011 Page 1 of 3 k:\Handouts\Permit Application