Loading...
19-103698 f f • 1i Electrical City of Federal Way F Permit #:19-103698-00-EL Community Development Dept L E 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: LAURELWOOD GARDEN APARTMENTS Project Address: 29505 21ST AVE S Parcel Number:422291 0010 Project Description: Bldg J-Unit#6,install 15mp heat pump circuit Owner Applicant Contractor ALLIED RESIDENTIAL WILL HANSENA C ELECTRIC SERVICE A C ELECTRIC SERVICE 1601 EAST VALLEY RD SUITE 180 20012 35TH AVE S CELECCE873OZ (9/9/21) RENTON WA 98057 SEATAC WA 98198 20012 35TH AVE S SEATAC WA 98198 Additional Permit Information Is this an Online or O.T.C.application') Yes %!' ', r�.x �"_'"' ;� »" • t�.,,�C 1 �,''�,---,p�:. � �;M, t5 ,�,.d ~ ` x: "f N;+ N� �^���.� �dl`ta �'�:„:-, •"r"X,.�«i..:'��',•�,5�";:= <cw>'t' -:s.` , .,},...':t. ,z .4F';,1'•wy`;a:'d,a".;�it"..�'.z �. Circuits-Multi-family 1 PERMIT EXPIRES Saturday, 1 August,2020 Permit Issued on Friday,August 2,2019 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Nh gt d Ey of Federal Way. L Owner or agent: Date: t Ipot,) THIS CARD IS TO REMAIN ON-SITE '40& Construction Inspection Record Federal Way INSPECTION REQUESTS: (253)835-3050 PERMIT#: 19 103698 00 Address: 29505 21ST AVE S Project: ALLIED RESIDENTIAL FEDERAL WAY WA 98003-3849 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 UFER Ground(4295) ID Ditch cover(4030) � Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date ® Pool Bonding(4195) ID Temporary Power(4275) 0 Service(4235) Approved Approved Approved By Date By Date By Date Feeders/Sub-panels(4045) ® Rough Electrical(4225) 0 Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date E:1 Final-Electrical(4055) By ,,pproved re-,2 =/9, ❑ Rough Electrical 0 Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date